$2M per occurrence / $5M aggregate general liability $2M GL
Registered on Avetta and ISNetworld Avetta · ISNetworld
Technology About Contact
Tracked loader with a forestry mulching head grinding cedar along a gravel road on public land (illustration)
Vegetation management / Public land managers

We build and maintain shaded fuel breaks to your spec and your bid paperwork.

Clear Ground builds shaded fuel breaks with tracked forestry mulchers, sized to the acreage. This page is for cities, counties, parks, water utilities, preserves, and state and federal agencies. The mulch stays on the ground. We read your spec first and bid what it says.

Tracked forestry mulchers and operators, bid to your form.

Austin, Texas · Central Texas public land · Same-business-day reply

Send us a solicitation

Send the next solicitation date. We read the spec and reply the same business day.

    We answer the same business day

    Your options for a public fuel break

    Five ways to build a fuel break. Mulching is our main work.

    Public land managers already run most of these. This table shows where contracted mulching fits next to the tools you have, and where it does not.

    ToolWhat it doesWhere it fitsOur part
    In-house crews and volunteersYour staff or partners cut and chip by hand.Small sites, sensitive ground and work you want to keep close. Crews run short in the busy season.We add capacity when your crews have no room.
    Hand crews with chainsaws and chippersCut by hand and chip or haul the debris.Steep ground, rocky ground, cave and karst edges and tight spots near structures.The bid marks where a hand crew fits.
    Forestry mulchingTracked machines with drum heads grind brush and cedar where it stands. The mulch stays on the ground.Cedar and brush on ground flat enough for tracked machines. Fuel breaks, trail edges and access cuts.This is our main work.
    Prescribed burnAgency crews burn the fuel under a plan.Large tracts with a trained burn crew, the right weather and a county that allows it. Best tool on big ground.Handled by agency burn crews.
    MowingTractors and boom mowers cut grass and light brush.Road shoulders, dam faces and grass fuel. Tractors beat any mulcher on grass.Handled by your mowing crews.

    Most agencies mix tools. We bring tracked mulchers and operators to the scope you assign.

    A burn crew wins on a big tract. A hand crew wins in a cave zone. A mulcher wins where cedar is thick, the ground is firm and you need a fuel break cut to a width by a date. Read more on forestry mulching and on our fuel break work.

    What the agency gets

    We bid your form, and bid what the spec says.

    Procurement staff want a clean bid. Program staff want the scope done. We aim at both.

    • Your units. Some agencies publish a price sheet with unit lines: new fuel break by the acre, maintenance by the acre, access cuts by the linear foot, remote work by the hour. We bid the units your sheet asks for and do not rewrite your form.
    • The spec read first. Specs name what decides a bid: stem diameter, mulch piece size, and what stays standing.
    • Maintenance as its own line. Brush grows back into a fuel break. We bid the repeat visit separately, so you can fund it by year.
    • Paperwork that files. A certificate of insurance naming your agency, with the additional-insured endorsement, before work starts.
    • Prime or direct. We bid direct, or we run mulchers and operators under a contract holder by the day or the job. See our subcontractor page.
    • A photo record. Photos by phase and a closeout note, so your file shows what changed on the ground.

    Tell us how your agency buys, and we follow it.

    Hill Country oak and juniper hillside with hiking trail, Balcones Canyonlands refuge
    Balcones Canyonlands National Wildlife Refuge, Central Texas. Photo: Toniklemm, CC BY-SA 4.0
    The process

    How a fuel break job runs, phase by phase.

    PHASE 01 / 05
    Before we start

    Read the spec,
    walk the site

    We read the solicitation, then walk the ground. At a pre-bid walk we attend. Flagging tape goes on every live oak and any tree the spec protects. We check for habitat, buffers and utilities. Where your solicitation sets a due date, we work to it.

    Spec review · Site walk · Habitat and buffer check · Written quote in 48 hours
    Two crew members in safety vests walking the cedar edge along a gravel road on public land, a live oak marked with orange tape to keep (illustration)
    PHASE 02 / 05
    Iron on the ground

    Cut to the width
    in your spec

    Our tracked mulchers cut the fuel break along the line on your map. Trees too big for a mulching head get called out on the walk, before work starts. We close the work area to the public while the heads run and post the dates. If anyone walks in, the work stops.

    Tracked mulchers · Cut to the mapped line · 300 foot clearance · Area closed to the public
    Mulching head grinding a cedar tree along a gravel road on public land (illustration)
    PHASE 03 / 05
    What stays behind

    Mulch to your spec,
    oaks standing

    Mulching leaves a layer of chips on the soil, with track marks where the mulchers crossed. Oaks stay standing, and so does the shade. If your spec sets a mulch piece size, we tell you before the bid whether our heads meet it. We haul nothing and burn nothing.

    Mulch left on site · No hauling · No burning · Oaks kept
    Fresh cedar mulch and track marks on the ground beside a kept live oak (illustration)
    PHASE 04 / 05
    The result

    A shaded fuel break
    cut to the line

    A shaded fuel break keeps the large trees and thins the understory below them. The canopy stays and the ladder fuel goes. The break follows the line you drew, and the edge reads clearly on the ground. Your staff walks it with us before we leave.

    Canopy kept · Understory thinned · Edge follows your line · Joint walk-through
    Cleared ground along a gravel road on public land, live oaks kept and mulch left on the ground (illustration)
    PHASE 05 / 05
    Closeout

    A file that
    stands up to audit

    You get photos of the work by phase and a closeout note in the unit lines of your price sheet. The note says what we cut, what we left and when the next pass is due. Your program staff files it. Procurement has the paper behind each invoice.

    Photos by phase · Closeout note · Next-pass date
    Hands holding a tablet that shows a ground-level photo of cleared ground and a kept live oak (illustration)
    Before (illustration)Dense cedar thicket along a gravel road on public land before clearing (illustration)
    After (illustration)The same view after mulching: cedar gone, live oaks kept, mulch on the ground (illustration)

    The same stretch of public land: dense cedar before, a shaded and open understory after.

    How public buyers buy

    Each agency buys differently, so we follow yours.

    Procurement staff run the bid. Program staff write the scope. We talk to both.

    A FEMA-funded Texas county fuels project planned skid-steer mulchers for shaded breaks anchored on both ends, with mulch left on the ground and stumps cut to ground level. Read the FEMA environmental finding. That is the kind of work we offer.

    • Cities and counties. Above $100,000 a Texas city or county has to use competitive sealed bids, competitive proposals or another method the statute allows. Below that line, local policy and a few state rules apply. We answer whichever your agency uses.
    • Invitations for bid. Some cities award on unit prices with insurance required, a pre-bid walk, and a primary and a secondary award. We bid the units on the sheet.
    • As-needed contracts. Some agencies award several firms, then issue task orders park by park. Some specs set the size of brush to remove and the size of mulch pieces left behind.
    • Federal land. Federal solicitations require SAM.gov registration, and small-business set-asides are common. Tell us what a solicitation requires and we answer in writing where we stand.
    • Grant-funded work. Federal and state grants carry their own procurement terms, including 2 CFR 200 for federal money. Tell us the funding source and we follow its paperwork.
    Historic Fannin County courthouse in Texas
    Fannin County Courthouse, Bonham. Each county buys its own way. Photo: Elli, CC0
    Season and wildlife

    Nesting and oak wilt set the calendar, and the best window is fall to winter.

    The best clearing window is September through February. Plan solicitations so the notice to proceed lands inside it.

    • Nesting season. Golden-cheeked warbler and black-capped vireo nesting runs March 1 to August 31. Some conservation-plan lands restrict clearing in that window. We check before we schedule. We plan around that whole span.
    • Habitat test. Warbler habitat is mature Ashe juniper mixed with oaks. Small juniper and pure cedar stands with few hardwoods usually are not habitat. Where a site could be habitat, the U.S. Fish and Wildlife Service guidance says to have its Austin office confirm that before clearing.
    • Oak wilt. Texas A&M Forest Service advises against wounding oaks from February through June. Our rule is no mulcher contact with oaks from February 1 to June 30. We paint any oak wound right away.
    • Burn bans. A burn ban targets outdoor burning, and we never burn. Our own rules go further: we stop mulching on red-flag days and in winds over 25 mph, and under an active burn ban we work only with written permission.
    Golden-cheeked warbler perched on Ashe juniper
    Golden-cheeked warbler on Ashe juniper. Nesting runs March 1 to August 31. Photo: Steve Maslowski, U.S. Fish and Wildlife Service, public domain
    On the ground

    A fuel break is not finished when it is cut, and the public is always nearby.

    Brush grows back into a fuel break. Agencies that fund maintenance keep their breaks open, and agencies that do not lose the first cut. We bid maintenance as its own line. See our annual maintenance work.

    • Public use. We close the work area, post the dates and keep people 300 feet from running equipment. Your staff gets the plan before we start.
    • Slope. Tracked mulchers do best on ground with little to no slope. We mark steep or rocky sections for hand work in the bid.
    • Power lines. We never mulch near energized lines. We leave any tree that can reach a line until the utility clears it.
    • Creeks and buffers. A watershed ordinance may require agency approval even for hand work near a creek. We map buffers first and stay outside them unless the agency approves.
    Hikers on the Summit Trail at Enchanted Rock, Texas Hill Country
    Hikers at Enchanted Rock State Natural Area. Photo: Larry D. Moore, CC BY 4.0
    Paperwork

    Procurement gets documents it can file.

    Procurement staff should not have to guess.

    Certificate of insurance

    General liability is $2,000,000 per occurrence and $5,000,000 aggregate with THREE, a Berkshire Hathaway company. The $1,000,000 commercial auto policy is with Progressive. The certificate names your agency, with the additional-insured endorsement, before work starts.

    Bonds

    Our broker can submit a bid or performance bond to a surety for each project once we have the form, the value and the obligee. Underwriting takes about 30 days and approval is not guaranteed. Send the bond requirement with the solicitation.

    Vendor registrations

    Tell us which portal or registration your solicitation requires. We answer in writing.

    Bid on your form

    Your unit lines, your spec, your addenda. One written bid, with the questions we have listed for the pre-bid.

    Safety packet

    Our written safety program and forestry mulching hazard analysis, sent before we mobilize.

    Photo record

    Photos by phase and a closeout note for the contract file.

    Questions procurement and program staff ask

    Are you on our bidder list?

    Tell us which portal or registration your solicitation requires. We answer in writing.

    Can you work under a prime?

    Yes. We run mulchers and operators under a contract holder by the day or the job. The prime keeps the contract and the relationship. We bring the equipment, the operators and our insurance certificate. See our subcontractor page for how that works.

    We already have contractors. Where would you fit?

    Ask who they are and whether they bring in subs. We fill gaps when a contractor's mulcher has no open days or the scope outgrows it. We work by the day or the job, and we do not ask you to change how you award.

    What will you charge?

    We bid the unit your sheet asks for, by the acre, the foot or the hour. We set the number after we read the spec and walk the site. You get it in writing within 48 hours of the walk, on your form.

    What about steep ground?

    Tracked mulchers do best on ground with little to no slope. Steep or rocky sections may need hand work, and we mark them in the bid so the scope shows what each tool covers.

    Do you burn or haul, and can you meet our mulch spec?

    We do neither. The mulch stays on site. If your spec sets a mulch piece size or a stem size cutoff, tell us in the pre-bid and we answer whether our heads meet it before the bid is due.

    What if a grant pays for the work?

    Some agencies fund fuel work from federal or state grants, and procurement terms come with the grant. Tell us the funding source and we follow its paperwork. The Forest Service grant page explains the landowner program.

    Who have you done this for?

    Cedar clearing in Killeen and a Texas A&M Forest Service grant job in Florence. A site walk shows you what we would run on your ground.

    Photo credits

    Images marked illustration are computer generated.

    Rather just talk
    to a person?

    (512) 880-8888

    Call or text 512-880-8888 · Send the next solicitation date

    Ask for a site walk