Dense forest with a defined next use. We clear it, prepare the surface, and photograph every stage.
Forest clearing mulches cedar thickets and mixed woodland in place so the ground is open for fencing, roads, pasture or a building site. It serves rural and estate owners and developers in Austin and the Texas Hill Country. Mixed stands run $2,800–$3,900 per acre and dense cedar $4,000–$5,200 per acre, typically 1–6 days, with the site walk and cleanup included.
Forest Clearing & Land Preparation occupies the ground between Field & Brush Clearing — which handles undergrowth and invasive species on otherwise open land — and land clearing, which delivers bare-dirt construction-ready grade and is priced separately. The output is a cleared forested surface with mulch in place, suitable for a defined next use without full land clearing.
The clearing scope and equipment are identical regardless of what the land becomes after. What changes is the preservation plan — which trees stay, where clearing zones begin and end — all defined from the site walk before any machine rolls.
Clearing the immediate footprint, access road corridor, and defensible space buffer for a cabin, barndominium, or rural outbuilding. We stake the building envelope within the existing canopy at the site walk before clearing begins.
Cutting a road corridor through forested acreage — width and alignment set at the site walk. FAE head handles mature cedar and mixed trees along the corridor. Corridor width is checked on the ground throughout. Stable mulched surface ready for graveling or rock milling.
Converting forested or cedar-dominated land to hay fields, improved pasture, row crops, or orchard preparation. Comprehensive clearing with preservation of water features and soil structure.
Clearing forested acreage for solar installation, water storage infrastructure, ag equipment staging, or utility corridor access. Mulch-in-place leaves the surface stable before installation — no bare-dirt erosion between clearing and construction. Clear area dimensions are checked on the ground against the infrastructure footprint.
Initial clearing of forested land ahead of subdivision layout, lot staking, and infrastructure design. Makes land visible, survey-accessible, and machine-navigable before grading begins. The after photos serve as the existing-conditions record for the full development scope.
Creating ATV corridors, shooting lanes, walking trail networks, or recreational clearings within forested acreage. Selective clearing preserves tree canopy and habitat structure while opening specific corridors. Precision alignment cutting from drone-defined axis maps.
Clearing forested sections of a Hill Country estate for landscape installation — opening terrain, revealing views, establishing areas for native plantings, hardscape, or pool and entertainment infrastructure. Often Phase 1 before pool excavation or foundation work on estate lots.
Clearing utility easements, power line corridors, pipeline ROW, and access easements through forested acreage. Before and after photos show clearing stayed within the easement limits you mark.
Forest clearing scope varies by canopy density, trunk diameter, terrain, and preservation requirements. Every project starts with a site walk that looks at all four, so price and timeline are set before the crew arrives.
Closed-canopy cedar monoculture or mixed forest — 6–14"+ trunk diameter, full canopy, no light at ground level. One pass opens the surface completely. It takes the most machine hours per acre.
Larger trunks process slower than small ones. No-daylight canopy limits machine visibility and pass speed. Intermixed hardwood and cedar requires more operator judgment than uniform stands. Rocky limestone terrain adds navigation complexity and head wear.
Mixed-age stands combining mature trees, mid-story cedar, undergrowth brush, and open patches — the typical condition of Hill Country acreage partially managed or transitioned from agricultural use over 15–25 years. Variable density noted zone by zone at the site walk.
Irregular density patterns reduce machine efficiency versus uniform stands. Properties with significant preservation requirements create transition areas needing careful operator work. Mixed species including thorny brush slow the FAE head more than single-species cedar.
Clearing that removes targeted species or density while preserving specific trees, habitat structure, or canopy zones. Common on estate properties where the goal is a managed, park-like forest — or on development sites where heritage trees, creek setbacks, or HOA covenants mandate precise clearing boundaries.
Selective work requires more operator judgment and slower speeds — the operator continuously navigates around preserved trees. Complex preservation plans with multiple species designations add planning time. Austin Heritage Tree compliance adds documentation requirements addressed at the pre-clearing site walk.
20+ acres of forest clearing for subdivision development, large-acreage agricultural conversion, or estate-scale restoration. Systematic zone-based clearing with phased mobilization available. Large tracts are quoted at the site walk.
Phased projects across multiple mobilizations carry a per-mobilization cost. Properties with distinct density zones require separate planning for each. Interim progress documentation for stakeholders or permitting adds photo and reporting time between phases.
Clearing adjacent to seasonal creeks, wet weather drainages, springs, and ponds with careful management of the riparian buffer zone. We walk the drainage features and flow paths before clearing, so the plan works around them.
Riparian terrain is inherently slower — slope transitions, wet soil, drainage crossings. Buffer preservation requirements create irregular clearing boundaries. Creek, floodplain or county setback rules can add paperwork.
Forest clearing on Austin-area properties subject to City of Austin tree rules. A protected tree is 19 inches or larger in diameter (any species), measured at 4.5 ft. A heritage tree is 24 inches or larger of a listed species, and removing one 30 inches or larger needs a variance (LDC 25-8-641). The critical root zone radius is 1 ft per inch of trunk diameter, and City of Austin ECM 3.5.2 allows limited work inside it. We map protected trees from the pre-clearing flight and plan around them. Last reviewed: September 2026.
Working around root zones requires slower, more deliberate operation throughout. Multiple heritage trees create no-go zones that break up efficient passes. Floodplain overlay zones may require additional City of Austin coordination.
Before a machine is scheduled, we walk the property with you. Tree canopy density is noted zone by zone. Individual specimen trees, creek features, drainage patterns, access constraints and grade changes are identified and marked. An optional drone scan adds a 3D surface model of the site, $500–$1,500 per scan.
Heritage trees and root zones, where applicable, are located before the clearing plan is written. The plan defines every clearing zone, preservation zone, access corridor, and boundary exactly. You review and approve it. That approved plan is what the operator executes — not a general instruction to "clear the property."
Our tracked forestry mulchers work the property in the sequence the plan defines — denser zones first for machine efficiency, preservation boundaries maintained throughout. Trees, cedar, brush, and understory are processed in a single continuous pass. Material returns to the soil at chip level. Nothing is burned and nothing is trucked off.
The operator works from the marked plan for zone boundaries, preservation setbacks and access constraints. One mobilization covers the full scope.
On multi-day projects, mid-job photos show what has been cleared and what remains. Preservation zone boundaries are checked against the plan, so nothing encroaches on root zones, creek buffers or property-line setbacks. Progress photos are shared so you can see the state of the land without driving out.
If a terrain feature changes the optimal sequence — an unexpected drainage crossing, a rock formation affecting access, a tree that wasn't visible from the ground at the walk — it's documented and the plan adjusted before proceeding. Nothing continues on assumption.
At the end we walk the completed clearing with you and compare it to the before photos. The photos show each cleared zone and each preservation boundary. If anything is off plan, we catch it before the crew demobilizes.
For Heritage Tree compliance projects, the after photos show the protected trees still standing, which can support a City review or a later dispute. For development projects, it serves as an existing-conditions record for the next phase. It is not a survey.
You get before-and-after photos of the property. Share them with architects, engineers, landscape designers, surveyors, lenders, or keep them for your records.
For projects where forest clearing is Phase 1 of a larger scope, the after photos become an existing-conditions record for land clearing, excavation or design. An optional drone scan adds a 3D surface model of the cleared ground. Neither replaces a boundary survey or an engineer's topo, and neither can see below ground.
We walk the property with you, mark trees and drainage, and price it by canopy density. Written quote within 48 hours of the site walk. No obligation.
Cedar and mixed woodland mulched in place, with the ground left open.
Forest Clearing & Land Preparation is frequently Phase 1 of a larger scope. The after photos serve as the existing-conditions record for whatever phase follows, and we handle the next phases directly.
When the cleared surface needs to become bare construction-ready dirt — root grubbing, rough grading, drainage modeling, rock milling, sub-base prep — land clearing follows as Phase 2, priced separately. The after photos are an existing-conditions record for planning.
Land clearingPool shell excavation, foundation excavation, utility trenching, or limestone rock excavation follows forest clearing when the land is ready for below-grade work. The cleared surface gives equipment direct access. The after photos show the cleared surface. Subsurface conditions are found with test holes, probing and 811 locates.
ExcavationWhen the cleared forest is the destination — not a precursor to construction — annual maintenance clearing keeps the open surface managed as seedlings and resprouters come back. Maintenance visits compare against the post-clearing baseline to target where regrowth has occurred.
Forestry MulchingPrice is driven by canopy density, trunk sizes, terrain and preservation requirements. The site walk pins those down. Ranges below are for forestry mulching in the Austin and Texas Hill Country market.
| Clearing Scope | Duration | Typical Acreage | Range |
|---|---|---|---|
| Dense Cedar / Mature Canopy — Full Clearing | 2–6 days | 2–20 acres | $4,000–$5,200 / acre |
| Mixed Forest & Brush — Full Clearing | 1–4 days | 1–15 acres | $2,800–$3,900 / acre |
| Selective Clearing with Preservation Plan | 1–5 days | 1–15 acres | $2,800–$3,900 moderate, $4,000–$5,200 dense / acre |
| Large Tract Clearing 20+ Acres | 5–20+ days | 20–200+ acres | $2,000–$5,200 / acre; quoted at the site walk |
| Riparian Buffer & Creek Corridor Clearing | 1–3 days | 1–8 acres | $2,800–$3,900 moderate, $4,000–$5,200 dense / acre |
| Protected-Tree / Root-Zone Clearing (Austin) | 1–4 days | Per scope | $2,800–$3,900 moderate, $4,000–$5,200 dense / acre |
| Road / Access Corridor Through Forest | 1–3 days | Per acre of corridor (length × width) | $1,600–$2,400 mowing, $2,000–$5,200 mulching |
| Cabin / Rural Structure Site Clearing | 0.5–2 days | Up to 1 acre | $2,800–$3,900 moderate, $4,000–$5,200 dense / acre |
Pricing includes operator, fuel and machine time. Highlighted rows are the most common scopes. Properties with significant limestone that need rock milling are quoted after the site walk. Bare-dirt, grubbed and hauled clearing is land clearing, priced separately. See pricing and the land clearing calculator.
Prices reviewed: September 2026. Ranges for Austin and Central Texas; your site walk sets the final number.
Forest Clearing & Land Preparation serves a wide mix of buyers, because forested land with a defined next use exists in every property category.
Hill Country estate and ranchette owners with forested acreage they want to open — for views, structure sites, agricultural conversion, or landscape development. The clearing is the transformation from what the land is to what the owner intends it to be, photographed before and after.
Developers and investors buying forested rural acreage for subdivision, agricultural conversion, or tract development — where forest clearing is Phase 1 before design, survey, and construction begin. The after photos give their engineers and architects a record of the cleared surface to start Phase 2.
Pool builders and infill developers who need vegetation cleared before land clearing or excavation can begin — particularly on Austin-area properties with significant overgrowth near the building envelope. Forest clearing as Phase 1 followed by land clearing as Phase 2 can be scoped together with one point of contact.
What matters is what happens before, during and after the pass, and what you get when the job is done.
The price comes from the site walk: zone-by-zone density, trunk sizes and terrain. When the crew arrives, the clearing plan matches the site.
Before and after photos show what changed, zone by zone, so you can see the cleared acreage.
City of Austin tree rules are addressed in the clearing plan. Protected trees and root zones are located before clearing, flagged in the plan and photographed after.
The FAE mulching head handles brush and trees in a single pass, with no felling crew, no haul trucks and no burning. One mobilization covers the full scope. Material is processed in place and the surface is finished when the pass is done.
The after photos give your design team a picture of the cleared site surface. They are not a survey and do not show below ground.
Wet weather drainages, seasonal creeks, springs, and drainage patterns are identified at the pre-clearing site walk before a single pass is made. The clearing plan routes around natural hydrology, protecting your site's water features.
The chip-level mulch returned to the cleared surface protects against erosion between forest clearing and whatever comes next. On development projects where Phase 2 mobilization is weeks away, the mulch layer prevents the bare-soil erosion that creates problems for subsequent grading.
$2,000,000 per occurrence / $5,000,000 aggregate general liability (THREE, a Berkshire Hathaway company), $1,000,000 commercial auto, and Texas workers' compensation with $1,000,000 employer's liability. Certificate of insurance and additional-insured endorsement provided before work starts. Registered on Avetta and ISNetworld.
Common questions from property owners, rural developers and builders about forest clearing scope, tree rules and what happens after.
We walk your forested property with you, mark trees and drainage, and send a written quote. No obligation to proceed.