Engineered plan required
Foundation excavation is the dig for a slab, pier-and-beam or stepped foundation, cut to your engineer's plan. We work for builders, GCs and owners in Austin and Central Texas. Most foundations run $15,000–$28,000 per structure, with spoil haul and bearing-surface prep included. Rock is billed per cubic yard. Most digs take one to four days on site.
The scope changes with what is being built, what the engineer specified and what the ground is doing. We work from your structural drawings. The price for each type below sits inside the range above and is set from your plans and the site walk.
Slab-on-grade, pier-and-beam and basement foundations. We dig to the engineer's plan: footer widths, depth to bearing, interior grade beams, and any drilled piers flagged for coordination.
Accessory dwelling units, detached garages and backyard structures. Tight access is common, so we use compact equipment, plan spoil handling and confirm clearance before we mobilize.
Ground-floor additions have to match the existing floor elevation, protect the current foundation and tie in the new footer. We work slowly at the joint between old and new.
Small commercial buildings, duplexes, fourplexes and infill multi-unit. Larger footprint, more spoil, more drainage staging. We coordinate with your GC's schedule and phase the work when the build requires it.
Central Austin infill lots often mean zero-lot-line digs, adjacent structures, protected trees and a narrow driveway. See tight lot and legacy tree excavation for how we plan those.
Hill Country lots often need stepped footings and terraced cuts. We work from the civil and structural drawings together: cut elevations, step locations, bench widths and drainage away from the foundation. Pad and drainage work is covered under grading and drainage.
We work from the structural engineer's foundation plan. Footer dimensions, bearing depth, step locations and setbacks are confirmed before we move dirt.
If your plans aren't final, we give you a range. When they're stamped, we lock the number.
West of the Balcones Fault, Edwards and Glen Rose limestone sit at or near the surface. East of it, you dig Austin Chalk and Blackland Prairie clay. They dig differently, and both can put rock in the footer.
| Area | Near-surface material | What it means for the dig |
|---|---|---|
| West of the fault (Hill Country, western Travis County) | Edwards and Glen Rose limestone, thin soil | Rock often reaches footer depth. Plan for the hydraulic hammer. |
| East of the fault | Austin Chalk, Blackland Prairie clay | Softer to cut, but chalk can need extended break time and clay moves with moisture. |
Rock is billed per cubic yard: $35–$45 per cubic yard for rippable caliche and soft limestone, $65–$90 per cubic yard for hard rock that needs the hammer. When the volume can't be known ahead of time, hammer work can be billed by the hour. A drone models the ground surface. Rock, footings and buried lines below the surface are found with test holes, probing, 811 locates and GPR where needed. For the full breakdown see limestone and rock excavation.
The main foundation perimeter plus interior grade beams and footer locations per the structural plan. We mark and confirm locations before digging.
The footer bearing surface is finished to the engineered elevation and cleared of loose material, so your concrete crew can form and pour without re-grading. Your engineer and inspector confirm it, not us.
We assess conditions on the site walk, give you a range before you commit, and bring an excavator with a hydraulic hammer when the ground calls for it. It is the same machine, so there is no second mobilization for the hammer.
Excavated material is hauled off and adjacent grade is left workable for framing and deliveries. No loose spoil pile against the future foundation walls.
If the dig slips, everything behind it slips. We set the start date when you confirm the plan is final. Most jobs start 1–3 weeks after approval.
We talk directly with your site super. Final photos go out before we leave, and any rock or soil surprise is flagged in writing so you have it for your engineer.
We confirm bearing elevations against the plan and flag discrepancies before we dig.
If site conditions differ from what the plan assumed, such as rock at a different depth or soil that doesn't match, we document it and call before continuing. As-dug photos and field notes are available for your project file.
Send the structural drawings or a PDF of the foundation plan. We quote from the dimensions. If plans aren't final we give a range, and the price locks when they are stamped.
Access route, overhead clearance, adjacent structures, utilities and ground conditions. Any rock flags reach you before you commit your concrete crew to a pour date.
Footer locations are staked or marked per plan and confirmed with your GC or super. If setbacks, an adjacent structure or a tree root zone don't match the plan, we flag it before moving dirt.
Perimeter cut, interior footers, bearing surface finish. Hydraulic hammer if rock shows up at footer depth. Step cuts per plan on sloped lots.
Material hauled off, adjacent grade left clear for forming and deliveries. Photos of the bearing surface and footer cuts go to you before we leave.
Footprint, foundation type, ground conditions and access set the price. These ranges are our rate card for Austin and Central Texas, not a national cost database.
| Line | Unit | Range | What moves it |
|---|---|---|---|
| Foundation excavation with spoil haul and bearing-surface prep | per structure | $15,000–$28,000 | Footprint, foundation type, access, spoil volume |
| Rippable caliche and soft limestone | per cubic yard | $35–$45 | Hardness and thickness |
| Hard rock that needs the hammer | per cubic yard | $65–$90 | Hardness, volume, whether the volume is known |
| Mobilization | per job | $725 | Distance from Austin |
Prices reviewed: September 2026. Ranges for Austin and Central Texas; your site walk sets the final number.
Most foundations run $15,000–$28,000 per structure, including spoil haul and bearing-surface prep. Footprint, foundation type, access and rock move the number. Send the plans and we quote from them.
We prefer the engineer's foundation plan and can give a range from preliminary drawings. The price locks when the structural plan is final. Footer errors are expensive to fix after the dig.
Rock is billed per cubic yard: $35–$45 per cubic yard for rippable caliche and soft limestone, $65–$90 per cubic yard for hard rock that needs the hammer. When the volume can't be known ahead of time, hammer work can be billed by the hour.
We walk the site, probe and dig test holes, and give you a written range. A drone models the ground surface. Rock, footings and buried lines below the surface are found with test holes, probing, 811 locates and GPR where needed. Nobody can promise rock depth from the surface, so the range is a range.
We stop, photograph, and call you. You and your engineer decide how to proceed. Field notes and photos go into your project file.
Most residential digs take one to four days on site once the crew is there. Most jobs start 1–3 weeks after approval. Rock, a large footprint or a tight lot adds time.
Yes. Stepped footings and terraced cuts are common in the Hill Country. Infill lots with tight access or protected trees are covered on our tight lot and legacy tree excavation page.
Texas law requires a locate request at least two business days before digging. 811 marks public lines only. Private lines on the lot, such as a gas or sewer service to an existing house, are found by probing and hand digging near them.
Sources: Texas811 for locate rules. Last reviewed: September 2026.
A PDF or link to your structural drawings is enough. We review, walk the site, and quote in writing. Written quote within 48 hours of the site walk.
Austin and Central Texas · $2M per occurrence / $5M aggregate general liability
Austin & Central Texas · Insured · Written quote within 48 hours of the site walk
Rather talk to a person? (512) 880-8888