Top Heavy Civil Contractors in Austin, Ranked by Awarded Work

By Cody Baird, OwnerUpdated October 18, 2026Award data through October 15, 2026

The top heavy civil contractor in Austin by public work awarded since October 2024 is the SAK & Shea joint venture. It holds the $698.1M I-35 drainage tunnel, 38% of all the dollars on this list. Without that one job, Webber is first with $208.1M and Williamson Creek Constructors JV is second with $125.6M.

42 firms won $1.85B in 140 public contracts from TxDOT, the City of Austin and CTRMA. Highway work is thin and a few firms hold it. Water and drainage work is spread across many.

$1.85Bawarded to 42 firms in 140 public contracts, 2024 to 2026
38%of it is one job: the $698.1M I-35 drainage tunnel
$1.15Bawarded to the other 41 firms, without the tunnel
$76.4Mof the total is term and IDIQ contract ceilings, not single jobs

Public awards, not opinion

Nobody paid to be listed, and the data is public and in the CSV. Clear Ground does the clearing and excavation that heavy civil primes hire out, but listing ourselves would discredit the list.

Picks by job type

The right firm depends on what you are building

Six picks, each ranked by award dollars for that kind of work in the data. The basis is under each heading. We left out site development: private site work never shows in a public record, so no award data ranks it. The card photos are stock images, not the projects listed.

Highway and interchange

TxDOT lets in the five MSA counties for new roads, interchanges, widening, intersections, safety and road rehabilitation, by low-bid dollars. Overlays and maintenance are not counted.

  1. Webber $208.1M in 2 contracts. Largest: US 183 from RM 1431 to Avery Ranch Blvd.
  2. Jordan Foster Construction $58.6M in 1 contract. Largest: SH 71 - Travis c/l to E. of Tucker Hill.
  3. Joe Bland Construction $23.2M in 2 contracts. Largest: US 183 from SH 138 to N of CR 254.
  4. Dan Williams Company $19.7M in 4 contracts. Largest: FM 812 from Watts Ln to Artesian Dr.
  5. C. E. Barker $18.8M in 1 contract. Largest: SH 95 from SL 230 to South of FM 535.

Bridge

TxDOT bridge lets plus City items with “bridge” in the project name, by dollars. The dollars are small: one bridge replacement and one trail bridge, and the rest is bridge maintenance.

  1. Gibson & Associates $4.1M in 2 contracts. Largest: RM 620 - Colorado River (BMIP24).
  2. Muniz Concrete & Contracting $3.4M in 1 contract. Largest: MoKan Trail Phase 5: Boggy Creek Bridge Rebid.
  3. Dan Williams Company $1.6M in 1 contract. Largest: On CR 143 at Dry Berry Creek.

Water and wastewater

City of Austin Council awards for pipelines, lift stations, reclaimed water and treatment work, by approved base amount.

  1. Williamson Creek Constructors JV $125.6M in 1 contract. Largest: Williamson Creek Wastewater Interceptor.
  2. Southland Contracting $50.7M in 1 contract. Largest: McNeil Drive Water Transmission Main.
  3. Santa Clara Construction $32.0M in 6 contracts. Largest: Cameron Road Wastewater Improvements.
  4. Facilities Rehabilitation $31.7M in 8 contracts. Largest: Astor Place Water and Wastewater Pipeline Rehabilitation.
  5. Cash Construction $26.4M in 3 contracts. Largest: Boggy Creek Lift Station Force Main Extension.

Streets, trails and corridors

City of Austin street, intersection, sidewalk and trail awards, by approved base amount. Term contracts count at their ceiling.

  1. DeNucci Constructors $82.9M in 6 contracts. Largest: 2020 Bond Substandard Streets Ross Road North.
  2. Alpha Paving Industries $33.0M in 4 contracts. Largest: Airport parking lots and roads, initial term.
  3. M.A. Smith Contracting $24.3M in 3 contracts. Largest: Slaughter Lane - Loop 1 to Brodie Lane - CAMPO.
  4. Muniz Concrete & Contracting $10.7M in 2 contracts. Largest: Corridor Mobility Program bike and pedestrian term contract.
  5. Rucoba & Maya Construction $2.1M in 1 contract. Largest: Burleson/Stassney High Crash Intersection Improvements.

Paving and overlays

TxDOT overlay, seal coat and sealed maintenance lets in the five counties, by low-bid dollars. These firms are paving-led.

  1. Lone Star Paving $49.9M in 15 contracts. Largest: SH130 & SH45 Frontage Road Mill & Inlay.
  2. Allen Keller Company $16.0M in 2 contracts. Largest: SH130 Frontage Road Mill & Inlay.
  3. Hunter Industries $10.1M in 4 contracts. Largest: US 90-S. of Mesquite to 0.20 W OF PLUM C.
  4. Dean Word Company $8.6M in 3 contracts. Largest: FM 696 from US 290 to Mundine Road.
  5. Texas Materials Group $4.3M in 1 contract. Largest: US 290 from SH 95 to FM 696 Overlay.

Drainage and flood control

The TxDOT I-35 tunnel plus City creek, storm drain and flood-risk awards, by dollars. Wastewater tunnels and interceptors are under water and wastewater.

  1. SAK & Shea JV $698.1M in 1 contract. Largest: N/S East Drainage Tunnel.
  2. Santa Clara Construction $12.3M in 2 contracts. Largest: West Bouldin Creek - Del Curto Storm Drain Improvements and….
  3. Austin Underground $5.0M in 2 contracts. Largest: Shoal Creek Trail at FM 2222 Underpass.
  4. Dalrymple Gravel & Contracting $3.3M in 1 contract. Largest: Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit.
  5. Facilities Rehabilitation $1.4M in 1 contract. Largest: Little Walnut Creek - Glenn Lane - Slayton Drive Storm Drain….

The ranking

The tunnel put one joint venture first. Without it, Webber leads

Dollars awarded as prime contractor, October 16, 2024 to October 15, 2026, with the contract count beside them. Remove the one tunnel job and its joint venture drops off the list, Webber moves to first and every other firm moves up one place.

With the tunnel

Ranked by dollars awarded, 2024 to 2026.

  1. SAK & Shea JV $698.1M
  2. Webber $208.1M
  3. Williamson Creek Constructors JV $125.6M
  4. DeNucci Constructors $98.3M
  5. Jordan Foster Construction $64.8M
  6. Southland Contracting $50.7M
  7. Lone Star Paving $50.2M
  8. Santa Clara Construction $44.3M

Without the tunnel

Same data, one job removed.

  1. Webber $208.1M
  2. Williamson Creek Constructors JV $125.6M
  3. DeNucci Constructors $98.3M
  4. Jordan Foster Construction $64.8M
  5. Southland Contracting $50.7M
  6. Lone Star Paving $50.2M
  7. Santa Clara Construction $44.3M
  8. Alpha Paving Industries $35.0M
Heavy civil firms ranked by public construction dollars awarded, 2024 to 2026
#FirmAwardedContractsRank without tunnelWhere the work came fromLargest award
1SAK & Shea JV$698.1M1off the listTxDOT 1 ($698.1M)$698.1M N/S East Drainage Tunnel.
2WebberThe Woodlands, TX$208.1M21TxDOT 2 ($208.1M)$139.8M US 183 from RM 1431 to Avery Ranch Blvd.
3Williamson Creek Constructors JVLivonia, MI (address on its Texas filing)$125.6M12City 1 ($125.6M)$125.6M Williamson Creek Wastewater Interceptor.
4DeNucci ConstructorsAustin, TX · includes $2.0M of term and IDIQ ceilings$98.3M83City 8 ($98.3M)$29.7M 2020 Bond Substandard Streets Ross Road North.
5Jordan Foster ConstructionInfrastructure group in Pflugerville, TX$64.8M24TxDOT 2 ($64.8M)$58.6M SH 71 - Travis c/l to E. of Tucker Hill.
6Southland ContractingGrapevine, TX (Southland Holdings)$50.7M15City 1 ($50.7M)$50.7M McNeil Drive Water Transmission Main.
7Lone Star PavingAustin, TX (mailing address of Asphalt Inc., LLC) · paving-led$50.2M166TxDOT 15 ($49.9M); CTRMA 1$12.1M SH130 & SH45 Frontage Road Mill & Inlay.
8Santa Clara ConstructionAustin, TX (state filing address) · includes $3.2M of term and IDIQ ceilings$44.3M87City 8 ($44.3M)$9.0M Cameron Road Wastewater Improvements.
9Alpha Paving IndustriesRound Rock, TX · paving-led · includes $33.4M of term and IDIQ ceilings$35.0M58City 5 ($35.0M)$18.9M Airport parking lots and roads, initial term.
10Facilities RehabilitationTaylor, TX (state filing address)$33.1M99City 9 ($33.1M)$6.5M Astor Place Water and Wastewater Pipeline Rehabilitation.
11Posillico CivilFarmingdale, NY$26.7M210TxDOT 1 ($4.5M); City 1 ($22.2M)$22.2M Fallwell Lane Capital Renewal.
12Joe Bland ConstructionAustin, TX$26.4M311TxDOT 2 ($23.2M); City 1 ($3.2M)$14.6M US 183 from SH 138 to N of CR 254.
13Cash ConstructionPflugerville, TX$26.4M312City 3 ($26.4M)$15.1M Boggy Creek Lift Station Force Main Extension.
14Matous ConstructionBelton, TX$25.6M113City 1 ($25.6M)$25.6M Hornsby Bend Dewatering Facility and East Stormwater Station….
15Dean Word CompanyNew Braunfels, TX$25.6M614TxDOT 6 ($25.6M)$10.0M RM 12 - US 290 to Travis C/L.
16M.A. Smith ContractingAustin, TX (state filing address) · includes $9.4M of term and IDIQ ceilings$25.5M415City 4 ($25.5M)$13.0M Slaughter Lane - Loop 1 to Brodie Lane - CAMPO.
17Hunter Industriespaving-led$23.0M716TxDOT 7 ($23.0M)$5.1M SH 304 from Bastrop CL to 3.2 mi S of CL.
18Dan Williams CompanyAustin, TX$21.3M517TxDOT 5 ($21.3M)$7.6M FM 812 from Watts Ln to Artesian Dr.
19Muniz Concrete & ContractingAustin, TX · includes $14.4M of term and IDIQ ceilings$19.1M418City 4 ($19.1M)$9.4M Corridor Mobility Program bike and pedestrian term contract.
20C. E. BarkerHouston, TX$18.8M119TxDOT 1 ($18.8M)$18.8M SH 95 from SL 230 to South of FM 535.
21Jay-Reese ContractorsDripping Springs, TX$18.8M120City 1 ($18.8M)$18.8M Davis WTP Raw Water Hydraulic and Energy Efficiency Improvements.
22S.J. Louis Construction of TexasRockville, MN$18.8M121City 1 ($18.8M)$18.8M Upper Harris Branch Wastewater Interceptor - Phase 1.
23Allen Keller CompanyFredericksburg, TX$16.0M222TxDOT 2 ($16.0M)$13.8M SH130 Frontage Road Mill & Inlay.
24Texas Road$15.7M223TxDOT 2 ($15.7M)$7.9M RM 1431 -Destination Way -E of Old 1431.
25Austin UndergroundJonestown, TX$14.3M624City 6 ($14.3M)$3.7M West Riverside Reclaimed Water Main.
26HEI Civil TexasOffices in AZ, NC, CO, Austin and Irving$14.2M325City 3 ($14.2M)$7.1M Colony Park Water Pipeline Renewal.
27MortMara (McMillen)Boise, ID$12.2M126City 1 ($12.2M)$12.2M Decker Power Plant - Dam Upgrades Reissue.
28E-Z Bel ConstructionSan Antonio, TX$9.6M827TxDOT 7 ($8.5M); CTRMA 1$2.3M Various: FY 2025 Site Specific Signals.
29Jerdon EnterpriseStafford, TX$8.1M228City 2 ($8.1M)$5.1M Williamson Creek - Richmond Tributary Rehabilitation Rebid.
30Arguijo Corporation$7.7M429City 4 ($7.7M)$3.7M Concordia Neighborhood Water and Wastewater Pipeline Renewal.
31RUTS Constructionincludes $7.0M of term and IDIQ ceilings$7.0M130City 1 ($7.0M)$7.0M Water and Wastewater Facilities Indefinite Delivery Indefinite….
32Rangeline Utility Servicesincludes $7.0M of term and IDIQ ceilings$7.0M131City 1 ($7.0M)$7.0M 2025 Facilities - Emergency and Lift Station - Indefinite….
33C.C. Carlton IndustriesAustin, TX$6.9M132City 1 ($6.9M)$6.9M Northwest Area Lift Station Improvements: Boulder Lane Lift Station.
34Austin Filter Systems$6.9M233City 2 ($6.9M)$5.7M Little Walnut Creek - Asian American Resource Center/Rutherford….
35Texas Materials GroupCedar Park, TX (Central Texas office) · paving-led$5.8M234TxDOT 2 ($5.8M)$4.3M US 290 from SH 95 to FM 696 Overlay.
36Rucoba & Maya Construction$5.7M235TxDOT 1 ($3.6M); City 1 ($2.1M)$3.6M FM 487 from College Ave to SH195 Bypass.
37Packsaddle Management$5.6M236City 2 ($5.6M)$3.6M Guildford Cove Boosted Pressure Zone Waterline Improvements.
38Underground Water SolutionsElgin, TX (City bid record)$5.4M237City 2 ($5.4M)$4.1M Central East Austin Water and Wastewater Pipeline Renewal.
39STX CivilLaredo, TX$4.3M238TxDOT 2 ($4.3M)$3.4M RM 150 - SE of Darden Hill to RM 1826.
40Gibson & AssociatesBalch Springs, TX$4.1M239TxDOT 2 ($4.1M)$3.3M RM 620 - Colorado River (BMIP24).
41Cedar Hills ConstructionCedar Park, TX$3.9M240City 2 ($3.9M)$2.8M Parker Lane Neighborhood (Catalina & Metcalf) Water and Wastewater….
42Dalrymple Gravel & ContractingPine City, NY (Texas office in New Braunfels)$3.9M241City 2 ($3.9M)$3.3M Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit.

TxDOT counts are lets where the firm was the low bidder. City counts are Council items marked Approved. The SAK and Shea joint venture is credited as filed at the full contract amount. Click a name for the profile or the table below. Download the award-level data or the ranking (CSV).

Firm profiles

The top 21: what each firm does, and what it won

Facts come from each firm’s own site, checked October 17, 2026. What a firm says about itself is marked as its claim. Dollar figures come from the public records named in each row. Photos come from each firm’s own site and are credited on the image.

#01 / 21

O’Fallon, MO (SAK) and Walnut, CA (J.F. Shea)

SAK & Shea JV
One job: the I-35 drainage tunnel

TxDOT’s bid tabulations list SAK Construction and J.F. Shea Construction as joint low bidder, at the same $698.1M, on the North/South East Drainage Tunnel under I-35 in Travis County. The letting was December 4, 2024. We credit the two as one joint venture, as filed. It is the only Austin-area award either partner shows in the data.

The venture has its own site, sak-shea.com, titled SAK-Shea JV, which names the I-35 Capital Express Central drainage tunnel and pump station. Shea’s own site does not mention the job. Shea says its roots go back to 1881. SAK calls itself a pipe-rehabilitation contractor, and its tunneling brand, Affholder, lists two earlier Austin tunnels.

Photo: the Brushy Creek raw-water tunnel boring machine near Austin, from SAK’s tunneling brand Affholder. It is not the I-35 job.

Awarded, 24 months
$698.1M in 1 contract. TxDOT 1 ($698.1M).
Largest award
$698.1M, N/S East Drainage Tunnel, Travis County (2024-12-04)
Founded
SAK 2006, Shea 1881 (company claims)
Websites
sak-shea.com (the venture), sakcon.com, jfsheaconstruction.com
By quarter

#02 / 21

The Woodlands, TX

Webber
The two biggest highway lets in the MSA

Webber was the low bidder on two TxDOT lets in the MSA: US 183 from RM 1431 to Avery Ranch Boulevard in Williamson County ($139.8M, January 2025) and the Loop 360 interchange at Courtyard Drive in Travis County ($68.4M, November 2025). Those two lets make up its whole total here.

Webber is a Ferrovial company. Ferrovial bought W.W. Webber in 2005, per Webber’s site. Webber says it is the largest transportation constructor in Texas. Its Central Texas office is in New Braunfels. Webber also says its Waterworks unit was awarded a $426M pump station for the CapEx project in Austin in 2025. That award is not in the data we count.

Photo: Webber’s Loop 12 job in Irving, from its Ferrovial project page. It is not an Austin job.

Awarded, 24 months
$208.1M in 2 contracts. TxDOT 2 ($208.1M).
Largest award
$139.8M, US 183 from RM 1431 to Avery Ranch Blvd, Williamson County (2025-01-07)
Founded
1963 (company claim)
Website
ferrovial.com
By quarter

#03 / 21

Livonia, MI (address on its Texas filing)

Williamson Creek Constructors JV
A $125.6M wastewater interceptor

The City Council approved the $125.6M Williamson Creek Wastewater Interceptor contract for Austin Water on February 5, 2026. An earlier version of the item was withdrawn on January 22. Four firms bid, and Posillico Civil, also on this list, was second, within 0.1% of this joint venture’s base proposal.

The City’s records name the joint venture and not its members. We could not find the members in any public source, so we do not name them. The bid listed subcontractors for pipe, grout, hauling and arborist work.

Awarded, 24 months
$125.6M in 1 contract. City 1 ($125.6M).
Largest award
$125.6M, Williamson Creek Wastewater Interceptor, City of Austin (Austin Water) (2026-02-05)
Founded
Not found
Website
Ranked on public awards; no website found
By quarter
$125.6Mawarded to Williamson Creek Constructors JV in 24 months, 1 contractAwarded in each three-month period

#04 / 21

Austin, TX

DeNucci Constructors
City streets, utilities and drainage

DeNucci won 8 City of Austin contracts. The largest are the Ross Road North street rebuild ($29.7M, February 2025), Burnet Road from Bright Verde Way to Loop 1 ($26.7M, January 2026) and the US 183 to Bright Verde Way segment, awarded on a rebid ($20.5M, December 2025). A $2.0M safety-project term contract is counted at its ceiling.

DeNucci says Paul DeNucci founded it in Austin in 1992, and that it self-performs excavation, underground utilities, road work and bridge work. Its About page also calls it a commercial general building and utilities contractor.

Photo: a dozer and roller grading a slope beside a two-lane road, from DeNucci’s gallery. The page does not name the job.

Awarded, 24 months
$98.3M in 8 contracts. City 8 ($98.3M).
Largest award
$29.7M, 2020 Bond Substandard Streets Ross Road North, City of Austin (Transportation and Public Works) (2025-02-27)
Founded
1992 (company claim)
Website
denucciconstructors.com
By quarter

#05 / 21

Infrastructure group in Pflugerville, TX

Jordan Foster Construction
The SH 71 interchange in Bastrop County

Jordan Foster was the low bidder on the SH 71 interchange from the Travis County line to Tucker Hill in Bastrop County ($58.6M, June 2025) and on SL 360 from Courtyard Drive to RM 2222 ($6.2M, May 2025).

It says it has operated since 1969, with an Infrastructure and Concrete Group in Pflugerville beside a building group. Its project page says the Loop 360 Western Rock Cut removed about 140,000 cubic yards of limestone.

Photo: the Loop 360 Western Rock Cut, from Jordan Foster’s project page. It is a TxDOT job, not one of the awards above.

Awarded, 24 months
$64.8M in 2 contracts. TxDOT 2 ($64.8M).
Largest award
$58.6M, SH 71 - Travis c/l to E. of Tucker Hill, Bastrop County (2025-06-04)
Founded
1969 (company claim)
Website
jordanfosterconstruction.com
By quarter

#06 / 21

Grapevine, TX (Southland Holdings)

Southland Contracting
The McNeil Drive water main

Southland won one contract in the data: the McNeil Drive Water Transmission Main for Austin Water ($50.7M, May 2025). The City’s item names Southland Contracting, Inc. as the contractor, and we credit it as filed.

Southland Contracting is one of six subsidiaries of Southland Holdings, per the group’s site. The group also lists American Bridge and Oscar Renda Contracting. Southland says it holed through the Mill Creek drainage tunnel in Dallas in 2022.

Photo: the Mill Creek tunnel boring machine in Dallas, from Southland’s site. It is not an Austin job.

Awarded, 24 months
$50.7M in 1 contract. City 1 ($50.7M).
Largest award
$50.7M, McNeil Drive Water Transmission Main, City of Austin (Austin Water) (2025-05-22)
Founded
1981 (company claim)
Website
southlandholdings.com
By quarter

#07 / 21

Austin, TX (mailing address of Asphalt Inc., LLC)

Lone Star Paving
Overlays and mill-and-inlay across the district

Lone Star Paving was the low bidder on 15 TxDOT lets worth $49.9M, mostly overlays and sealed maintenance work. The largest are the SH 130 frontage road mill and inlay in Travis County ($12.1M) and the SH 29 overlay in Williamson County ($9.2M). CTRMA also approved a $0.3M repair agreement.

We flag it as paving-led. We found no website. The legal entity on the Texas filing is Asphalt Inc., LLC, and the TxDOT, City and CTRMA records use the Lone Star Paving name.

Awarded, 24 months
$50.2M in 16 contracts. TxDOT 15 ($49.9M); CTRMA 1.
Largest award
$12.1M, SH130 & SH45 Frontage Road Mill & Inlay, Travis County (2025-08-07)
Founded
Not found
Website
Ranked on public awards; no website found
By quarter
$50.2Mawarded to Lone Star Paving in 24 months, 16 contractsAwarded in each three-month period

#08 / 21

Austin, TX (state filing address)

Santa Clara Construction
Lift stations, sewer lines and storm drains

Santa Clara won 8 City contracts. The largest are the Cameron Road wastewater improvements ($9.0M, April 2026) and the West Bouldin Creek storm drain ($8.8M, September 2025). The rest are lift stations, pipeline renewal and flood-risk work. One is a $5.8M utility relocation at SH 71 and US 183.

Council also ratified an emergency contract with Santa Clara for the Jamestown Tributary bank repair in April 2026, at a $7.3M not-to-exceed amount that includes a 10% contingency. The City’s backup gives no signing date, so we do not count it. We found no website.

Awarded, 24 months
$44.3M in 8 contracts. City 8 ($44.3M).
Largest award
$9.0M, Cameron Road Wastewater Improvements, City of Austin (Austin Water) (2026-04-09)
Founded
2005 (Texas charter date)
Website
Ranked on public awards; no website found
By quarter
$44.3Mawarded to Santa Clara Construction in 24 months, 8 contractsAwarded in each three-month period

#09 / 21

Round Rock, TX

Alpha Paving Industries
Airport roads and street overlays

Alpha Paving won 5 City contracts. The largest is $18.9M for airport parking lots and roads at Austin-Bergstrom, for the first two years. Most of the rest are term contracts for street overlay, safety-project and utility restoration work. $33.4M of its $35.0M is a term or IDIQ ceiling.

We flag it as paving-led: its site describes a paving and concrete maintenance company with a road construction page. Alpha says Pave America bought it in 2021.

Photo: an Alpha Paving truck feeding a paver on a resurfacing job, from its road construction page.

Awarded, 24 months
$35.0M in 5 contracts. City 5 ($35.0M).
Largest award
$18.9M, Airport parking lots and roads, initial term, City of Austin (airport) (2025-03-06)
Founded
Not found (says it has served Austin since 2012)
Website
alphapavingtexas.com
By quarter

#10 / 21

Taylor, TX (state filing address)

Facilities Rehabilitation
Water and wastewater pipeline renewal

Facilities Rehabilitation won 9 City contracts, mostly water and wastewater renewal and lift-station work for Austin Water. The largest are the Astor Place pipeline rehabilitation ($6.5M, April 2026) and Old Enfield ($6.2M, November 2024).

We found no website. Its Texas filing shows an address in Taylor and a 2003 charter date.

Awarded, 24 months
$33.1M in 9 contracts. City 9 ($33.1M).
Largest award
$6.5M, Astor Place Water and Wastewater Pipeline Rehabilitation, City of Austin (Austin Water) (2026-04-09)
Founded
2003 (Texas charter date)
Website
Ranked on public awards; no website found
By quarter
$33.1Mawarded to Facilities Rehabilitation in 24 months, 9 contractsAwarded in each three-month period

#11 / 21

Farmingdale, NY

Posillico Civil
A New York firm with Texas crews

Posillico won the Fallwell Lane capital renewal for Austin Energy and Austin Water ($22.2M, July 2025) and the FM 112 road rehabilitation in Williamson County ($4.5M, November 2025). It was also second of four bidders on the Williamson Creek interceptor.

Posillico says it was incorporated in 1946, is in its fourth generation and has worked in Central and South Texas since 2019.

Photo: the Country Club Creek channel job in Austin, from Posillico’s project page. It is not one of the awards above.

Awarded, 24 months
$26.7M in 2 contracts. TxDOT 1 ($4.5M); City 1 ($22.2M).
Largest award
$22.2M, Fallwell Lane Capital Renewal, City of Austin (Austin Water) (2025-07-24)
Founded
1946 (company claim)
Website
posillicoinc.com
By quarter

#12 / 21

Austin, TX

Joe Bland Construction
US 183 and US 290 for TxDOT

Joe Bland won 3 contracts we count. TxDOT lets: US 183 from SH 138 north in Williamson County ($14.6M, November 2025) and US 290 at FM 973 ($8.6M, August 2026). City award: a Colony Park electric work order ($3.2M). We do not count the $9.5M William Cannon Drive West Approach repair. Council ratified it in April 2025, and its backup gives no signing date.

Joe Bland says it has served Central Texas since 1957 and is family owned. Its services list includes earthwork, utilities, lift stations and rock excavation. It also lists roadway and bridge work.

Photo: an excavator at a pipe trench, from Joe Bland’s projects page. The page does not name the job.

Awarded, 24 months
$26.4M in 3 contracts. TxDOT 2 ($23.2M); City 1 ($3.2M).
Largest award
$14.6M, US 183 from SH 138 to N of CR 254, Williamson County (2025-11-05)
Founded
1957 (company claim)
Website
joeblandconstruction.com
By quarter

#13 / 21

Pflugerville, TX

Cash Construction
Force mains, reclaimed water and airport roads

Cash won 3 City contracts. They are the Boggy Creek lift-station force main ($15.1M, March 2025), the Cargo Avenue reconstruction at the airport ($6.3M, November 2025) and the Travis Heights reclaimed water main ($5.0M, December 2025).

Cash says it was established in the 1970s. It says it owns more than 300 machines and does nearly all its work with its own crews. Its site links to MasTec as its parent company.

Awarded, 24 months
$26.4M in 3 contracts. City 3 ($26.4M).
Largest award
$15.1M, Boggy Creek Lift Station Force Main Extension, City of Austin (Austin Water) (2025-03-27)
Founded
1970s (company claim, no year)
Website
cashconstruction.com
By quarter
$26.4Mawarded to Cash Construction in 24 months, 3 contractsAwarded in each three-month period

#14 / 21

Belton, TX

Matous Construction
Water and wastewater plants

Matous won one contract in the data: the Hornsby Bend dewatering facility and east stormwater station improvements for Austin Water ($25.6M, July 2025).

Matous says its focus is only water and wastewater and that it self-performs over 75% of its work. It builds treatment plants, lift stations and intake structures, so it is a plant builder more than a pipeline contractor.

Photo: a crane at a water treatment plant under construction, from Matous’s past-projects page.

Awarded, 24 months
$25.6M in 1 contract. City 1 ($25.6M).
Largest award
$25.6M, Hornsby Bend Dewatering Facility and East Stormwater Station…, City of Austin (Austin Water) (2025-07-24)
Founded
1993 (company claim)
Website
matousconstruction.com
By quarter

#15 / 21

New Braunfels, TX

Dean Word Company
Hill Country highway widening and overlays

Dean Word was the low bidder on 6 TxDOT lets. The largest are the RM 12 widening from US 290 to the Travis County line ($10.0M, April 2026), the FM 696 overlay in Bastrop County ($6.4M) and RM 3237 intersection work in Hays County ($5.0M).

Dean Word says it has built Texas roads since 1890 and runs its own pits, quarries and hot-mix plants. Its site gives its age two ways, so we quote only the 1890 claim.

Photo: a crew finishing a concrete intersection pour, from Dean Word’s projects page.

Awarded, 24 months
$25.6M in 6 contracts. TxDOT 6 ($25.6M).
Largest award
$10.0M, RM 12 - US 290 to Travis C/L, Hays County (2026-04-08)
Founded
1890 (company claim)
Website
deanword.com
By quarter

#16 / 21

Austin, TX (state filing address)

M.A. Smith Contracting
Slaughter Lane and corridor work for the City

M.A. Smith won 4 City contracts: Slaughter Lane from Loop 1 to Brodie Lane ($13.0M, May 2025), a $9.4M corridor-mobility term contract at its ceiling, the 7th Street and Springdale Road intersection ($2.0M) and a park ($1.1M). We do not count its biggest City job, the $30.9M Little Walnut Creek flood-risk project. Council ratified it in August 2026, but the City’s backup says the agreement was signed in June 2023.

We found no website. Its Texas filing reads M. A. Smith Contracting Company, Inc. City items spell it M.A. Smith, MA Smith and Smith Contracting Co. We count them as one firm because the City’s bid lists carry the names together.

Awarded, 24 months
$25.5M in 4 contracts. City 4 ($25.5M).
Largest award
$13.0M, Slaughter Lane - Loop 1 to Brodie Lane - CAMPO, City of Austin (Transportation and Public Works) (2025-05-08)
Founded
1994 (Texas charter date)
Website
Ranked on public awards; no website found
By quarter
$25.5Mawarded to M.A. Smith Contracting in 24 months, 4 contractsAwarded in each three-month period

#17 / 21

Base not confirmed

Hunter Industries
Overlays and safety projects

Hunter was the low bidder on 7 TxDOT lets worth $23.0M. The largest are SH 304 intersection work in Caldwell County ($5.1M), FM 3349 widening in Williamson County ($4.7M) and a US 90 overlay in Caldwell County ($4.3M).

We flag it as paving-led. Its website is a placeholder with no company details, so we cannot confirm its base or services from a page it owns. Hunter Industries, Ltd. is not the irrigation maker of the same name.

Awarded, 24 months
$23.0M in 7 contracts. TxDOT 7 ($23.0M).
Largest award
$5.1M, SH 304 from Bastrop CL to 3.2 mi S of CL, Caldwell County (2026-09-03)
Founded
Not found
Website
hunterindustriesltd.com (placeholder page, no company details)
By quarter
$23.0Mawarded to Hunter Industries in 24 months, 7 contractsAwarded in each three-month period

#18 / 21

Austin, TX

Dan Williams Company
Highway safety work and a bridge replacement

Dan Williams was the low bidder on 5 TxDOT lets: FM 812 safety work in Bastrop County ($7.6M, June 2025), SH 29 intersection work in Williamson County ($7.6M, June 2026), a county road bridge replacement ($1.6M) and two smaller ones.

It says it is a recognized leader in heavy highway construction in Central and far West Texas. It lists a corporate office in Austin and a second office in El Paso.

Awarded, 24 months
$21.3M in 5 contracts. TxDOT 5 ($21.3M).
Largest award
$7.6M, FM 812 from Watts Ln to Artesian Dr, Bastrop County (2025-06-04)
Founded
Not found (says over 30 years)
Website
danwilliamscompany.com
By quarter
$21.3Mawarded to Dan Williams Company in 24 months, 5 contractsAwarded in each three-month period

#19 / 21

Austin, TX

Muniz Concrete & Contracting
Sidewalks, trails and corridor projects

Muniz won 4 City contracts: a $9.4M corridor-mobility term contract for bicycle and pedestrian work, a $5.0M local-mobility term contract (both counted at their ceilings), the MoKan Trail bridge ($3.4M, September 2025) and the Rutland and Parkfield roundabout ($1.3M, October 2026).

Muniz says it has more than 25 years in public infrastructure. Its services list covers curb and gutter, sidewalks and ADA ramps, trails, drainage structures and retaining walls. It is concrete-led.

Photo: a finished concrete curb ramp with tactile pavers, from Muniz’s services page. The page does not name the corner.

Awarded, 24 months
$19.1M in 4 contracts. City 4 ($19.1M).
Largest award
$9.4M, Corridor Mobility Program bike and pedestrian term contract, City of Austin (Transportation and Public Works) (2025-07-24)
Founded
Not found (says over 25 years)
Website
munizcontracting.com
By quarter

#20 / 21

Houston, TX

C. E. Barker
SH 95 intersection work in Bastrop County

C. E. Barker was the low bidder on one TxDOT let: SH 95 from SL 230 to south of FM 535 in Bastrop County ($18.8M, August 2025).

It calls itself a sitework and heavy civil contractor that specializes in roads, utility systems and detention facilities. Its only listed office is in Houston.

Awarded, 24 months
$18.8M in 1 contract. TxDOT 1 ($18.8M).
Largest award
$18.8M, SH 95 from SL 230 to South of FM 535, Bastrop County (2025-08-08)
Founded
1996 (company claim)
Website
cebarkerltd.com
By quarter
$18.8Mawarded to C. E. Barker in 24 months, 1 contractAwarded in each three-month period

#21 / 21

Dripping Springs, TX

Jay-Reese Contractors
Water treatment plant work for the City

Jay-Reese won 1 contract we count: the Davis Water Treatment Plant raw water improvements ($18.8M, July 2025). Council also ratified four emergency contracts with it in the window, worth $11.9M. We count none. One was signed in November 2020, and the backups for the other three give no signing date.

Jay-Reese says it was founded in 1990 and has done bridge work, utilities, dams, airports and railroads.

Photo: workers at wall forms on the Seaholm project in Austin, from Jay-Reese’s site.

Awarded, 24 months
$18.8M in 1 contract. City 1 ($18.8M).
Largest award
$18.8M, Davis WTP Raw Water Hydraulic and Energy Efficiency Improvements, City of Austin (Austin Water) (2025-07-24)
Founded
1990 (company claim)
Website
jayreese.net
By quarter

Ranks 22 to 42

The other 21 ranked firms, in brief

These firms won less than the top 21. A firm with no website we could find is marked "ranked on public awards; no website found" and is listed with the public record that put it here.

Ranks 22 to 42: the rest of the ranked firms
#FirmAwardedContractsBased inWhat the data showsWebsite
22S.J. Louis Construction of Texas$18.8M1Rockville, MN$18.8M Upper Harris Branch Wastewater Interceptor - Phase 1.sjlouis.com
23Allen Keller Company$16.0M2Fredericksburg, TX$13.8M SH130 Frontage Road Mill & Inlay.allenkellerco.com
24Texas Road$15.7M2Not found$7.9M RM 1431 -Destination Way -E of Old 1431.Ranked on public awards; no website found
25Austin Underground$14.3M6Jonestown, TX$3.7M West Riverside Reclaimed Water Main.austin-underground.com
26HEI Civil Texas$14.2M3Offices in AZ, NC, CO, Austin and Irving$7.1M Colony Park Water Pipeline Renewal.heicivil.com
27MortMara (McMillen)$12.2M1Boise, ID$12.2M Decker Power Plant - Dam Upgrades Reissue.No verified website
28E-Z Bel Construction$9.6M8San Antonio, TX$2.3M Various: FY 2025 Site Specific Signals.ezbelconstruction.com
29Jerdon Enterprise$8.1M2Stafford, TX$5.1M Williamson Creek - Richmond Tributary Rehabilitation Rebid.jerdonlp.com
30Arguijo Corporation$7.7M4Not found$3.7M Concordia Neighborhood Water and Wastewater Pipeline Renewal.Ranked on public awards; no website found
31RUTS Construction$7.0M1Not found$7.0M Water and Wastewater Facilities Indefinite Delivery Indefinite….No verified website
32Rangeline Utility Services$7.0M1Not found$7.0M 2025 Facilities - Emergency and Lift Station - Indefinite….Ranked on public awards; no website found
33C.C. Carlton Industries$6.9M1Austin, TX$6.9M Northwest Area Lift Station Improvements: Boulder Lane Lift Station.cccindltd.com
34Austin Filter Systems$6.9M2Not found$5.7M Little Walnut Creek - Asian American Resource Center/Rutherford….Ranked on public awards; no website found
35Texas Materials Grouppaving-led$5.8M2Cedar Park, TX (Central Texas office)$4.3M US 290 from SH 95 to FM 696 Overlay.texasmaterials.com
36Rucoba & Maya Construction$5.7M2Not found$3.6M FM 487 from College Ave to SH195 Bypass.Ranked on public awards; no website found
37Packsaddle Management$5.6M2Not found$3.6M Guildford Cove Boosted Pressure Zone Waterline Improvements.Ranked on public awards; no website found
38Underground Water Solutions$5.4M2Elgin, TX (City bid record)$4.1M Central East Austin Water and Wastewater Pipeline Renewal.Ranked on public awards; no website found
39STX Civil$4.3M2Laredo, TX$3.4M RM 150 - SE of Darden Hill to RM 1826.stxcivil.com
40Gibson & Associates$4.1M2Balch Springs, TX$3.3M RM 620 - Colorado River (BMIP24).gibsonassoc.net
41Cedar Hills Construction$3.9M2Cedar Park, TX$2.8M Parker Lane Neighborhood (Catalina & Metcalf) Water and Wastewater….cedarhillsconstruction.com
42Dalrymple Gravel & Contracting$3.9M2Pine City, NY (Texas office in New Braunfels)$3.3M Shoal Creek - MoPac/Steck Water Quality Ponds Retrofit.dalrymplegravel.com

Method

How we ranked them: public records, not opinions

One window for every source: October 16, 2024 to October 15, 2026. TxDOT’s public bid-tab data only reaches back 24 months, so the other sources use the same 24.

  • Window rule. A contract counts only if its award date falls in the window: the TxDOT letting, the Council vote or the CTRMA board vote. For an emergency contract that Council ratified afterward, the date it was signed must fall in the window. We read each ratification's backup. Contracts signed before the window, or with no signing date in the City's record, are not counted. We never count a figure we computed.
  • Who's in. Firms whose main business is highway, bridge, utility, drainage or earthwork, judged from their own site. 12 ranked firms have no website we could find, so we judged them on their awarded work alone and they need $5M awarded to be listed. Everyone else needs $1M. Paving-led firms are in and flagged.
  • Who's out. Vertical general contractors, electrical, signal, striping and planting trades, materials suppliers, pipe-lining specialists and small bridge-repair or guardrail firms we could not confirm. Every excluded award, with the reason, is in the CSV.
  • The rank. Public construction dollars awarded as prime contractor, with the contract count beside it. 42 firms, $1.85B across 140 contracts.
  • TxDOT. Austin District lets in Travis, Williamson, Hays, Bastrop and Caldwell counties, from TxDOT’s Bid Tabulations dataset. We count the low bidder at the letting. As a check, TxDOT’s awarded-contracts export listed 33 awards statewide on October 1 to 15, 2026, and the awarded vendor was the low bidder in 33 of 33. None of the 33 was in the Austin District. The export holds only the latest two weeks, so it checks the rule statewide, not Austin work.
  • City of Austin. Council items from the City Clerk's action notes, 229 meetings. We kept only items marked Approved, at the base amount as approved, without contingency. Airport and Austin Water awards come through the same Council agenda. Withdrawn and postponed items are not counted. Where Council approved one firm and later ratified another firm’s emergency contract for the same project, or the City rejected all bids and rebid the job, we credit only the contract of record or the rebid award.
  • CTRMA. 2 board-approved agreements, at the not-to-exceed amount, kept only when an adopted resolution or the approved minutes name the contractor.
  • Joint ventures. A joint venture is credited as filed, with its partners shown. Partners are not ranked on their own.
  • Name matching. Contractor names are typed by hand in every source, so we matched spellings by hand. “Smith Contracting Co.” and “M.A. Smith Contracting” count as one firm.
  • Term and IDIQ contracts. Some City contracts are approved as a ceiling for a one- or two-year term, not as one job. We count the initial-term amount as approved, and the ranking table shows how much of a firm's total is ceiling.
  • Not used. Price, ratings, safety records and paid placement.
  • Independence. Clear Ground publishes this list and does not rank itself.

Download the award-level data (CSV)

Limits

Awards show who wins public work, not who builds it best

  • Public work only. Private site work never appears in a public record. A firm that builds mostly for developers ranks low here and may be large.
  • Only three owners. The data is TxDOT lettings, the City of Austin Council and CTRMA. It leaves out other cities (Round Rock, Georgetown, Cedar Park, Pflugerville, Leander, San Marcos, Kyle, Hutto and Bastrop), the counties, LCRA, the Brushy Creek utility authority, Capital Metro, school districts, universities and private owners. It also leaves out TxDOT contracts bought outside the public letting.
  • Low bid, not award. For TxDOT we have the low bidder at the letting, not the signed award. A bid can be rejected. The most recent letting, October 6, 2026, may not be awarded yet.
  • Counties left out. Travis County, Williamson County and Hays County awards are not in the numbers. Their portals block automated requests or run only in a browser.
  • Award values, not payments. Amounts are what an owner approved or bid, not what was paid. Change orders and final quantities move them.
  • Subcontracts are invisible. A firm that does the earthwork or clearing under a prime shows up nowhere. The prime gets the credit.
  • City amounts. City figures are the base contract in the Council item. Contingency is left out. Items under the City Manager's spending authority never reach Council, so they are not here.
  • Dated. Data through October 15, 2026. We plan to re-run the pull each quarter.
  • Corrections. If a fact or photo about your firm is wrong, email cody@clearground.com with a source and we will fix it.

What we charge

Trenching for a prime runs

$5–$40

That is per linear foot, and depth and rock drive the price. Rock excavation runs $35–$90 per cubic yard. Haul-off runs $1,000–$3,500 per job, and mobilization is $725 per job.

See trenchingAll pricing

Our services

We also provide clearing, excavation and trenching for primes

We do the clearing, excavation and haul-off that heavy civil primes hire out, and the demolition of structures, slabs and rock ahead of them. Our bond and registrations: City of Austin contractor registration and right-of-way bond, Avetta, ISNetworld, USDOT 8808831.

Common questions

Austin heavy civil contracting, answered

Who is the biggest heavy civil contractor in Austin?

By public work awarded in the last 24 months, the SAK & Shea joint venture leads with the $698.1M I-35 drainage tunnel. Without that one job, Webber leads with $208.1M. Private work is not counted.

How did you rank Austin heavy civil contractors?

We ranked firms by public construction dollars awarded as prime contractor from October 16, 2024 to October 15, 2026, with the contract count beside it. Sources are TxDOT Austin District lets, City of Austin Council awards and CTRMA board awards. The data is in the CSV on this page.

Why is the I-35 tunnel shown separately?

The tunnel is 38% of all the dollars on the list. Remove it and its joint venture drops off the list, Webber moves to first and every other firm moves up one place.

Does a high rank mean a better contractor?

No. The rank shows who won public work, not who did it well or on time. We did not use ratings or safety records. Ask for references from owners on jobs like yours.

Why is a large contractor I know missing?

It won no public award in these sources in the window, or it builds mostly private work. County awards in Travis, Williamson and Hays counties are also outside the data.

Are Travis, Williamson and Hays County awards included?

No. Those counties' award portals block automated requests or only work in a browser, so their road-bond awards are not in the numbers. TxDOT lets inside those counties are included.

Can a contractor pay to be on this list?

No. The ranking comes from public records. Nobody paid to be listed.

How often is the list updated?

We plan to re-run it each quarter. A script re-pulls each source and rebuilds the CSV and the ranking, and the date at the top shows the last run.

Does Clear Ground work for heavy civil contractors?

Yes. We clear, excavate, trench and haul off as a subcontractor in Austin, the Texas Hill Country and Central Texas. Trenching runs $5–$40 per linear foot and rock excavation $35–$90 per cubic yard. Depth and rock move both.

Working on an Austin project?

Working on an Austin heavy civil job?

We scope every project in person before quoting. If we are not the right fit, we will say so.

Request a quote

Austin, the Texas Hill Country and Central Texas