$2M per occurrence / $5M aggregate general liability $2M GL
Registered on Avetta and ISNetworld Avetta · ISNetworld
Technology About Contact

Texas Resource

Top utility and energy contractors in Texas, by job type

By Cody Baird, OwnerUpdated October 18, 2026ERCOT data through September 2026

21 utility and energy contractors on this page have documented Texas work. We sorted them by job type and did not rank them. No public Texas record counts this work by contractor.

ERCOT's September 2026 queue lists 200 power projects, 46.1 GW, in the 23 counties from Waco to San Antonio where we work. Batteries are the largest share at 20.5 GW, then gas at 13.9 and solar at 10.8.

200queued power projects in the 23 counties from Waco to San Antonio where we work
46.1 GWnet capacity in those projects, ERCOT September 2026
21contractors listed, in five job types
0firms ranked: no public data counts this work by firm

Not a ranking

Firms are grouped by job type, each with the Texas record we could check. Nobody paid to be listed, and we show no star ratings or safety scores. Clear Ground does right-of-way clearing and solar site prep too, but listing ourselves would discredit the list.

Picks by job type

Five job types, and the firms with Texas work in each

Each list is alphabetical, not ranked. The basis is under each heading. A firm is here if its own site or a public record shows Texas work or a Texas office for that job type.

Transmission and distribution lines

Own site lists line or underground utility work and a Texas unit, or a public Texas award

  1. Austin Underground Austin Energy bore contract, 2026
  2. Primoris Services Power Line Services and Primoris T&D, Fort Worth
  3. Quanta Services LCRA 2008 and ETT 2012 awards

Substations

Own site lists substation construction and a Texas office

  1. Primoris Services Fort Worth T&D unit
  2. Quanta Services Houston headquarters
  3. Rosendin Four Texas offices; 150+ high-voltage substations, per its site

Utility vegetation management

Named in an Austin Energy contract, or own site lists utility vegetation work and a Texas base

  1. Asplundh Tree Expert Austin Energy, 2020 and 2024
  2. Davey Tree Surgery Co. Austin Energy, 2020 and 2024
  3. Eocene Environmental Group Austin Energy, 2026
  4. Pannell Co. Boerne; utility line clearing, per its site
  5. TREES, LLC Houston; utility vegetation since 1953, per its site
  6. Wright Tree Service Austin Energy, 2020 to 2026

ROW clearing and mulching

Own site lists right-of-way clearing in Texas, for utilities, pipelines or highways

  1. 5K Land Management DFW area; Texas and Oklahoma
  2. Cactus Creek Land Clearing Kerrville
  3. Cedar Eaters of Texas Comfort
  4. Cleartex Forestry Houston
  5. Eggemeyer Land Clearing New Braunfels; highway rights of way
  6. King's Land Clearing and Maintenance Paris; pipeline rights of way
  7. Texas Land Clearing Services Hondo; also solar and wind clearing

Solar and battery storage EPC

A Texas project on its own site

  1. McCarthy Building Companies Bright Arrow, Hopkins County
  2. Mortenson Texas Solar Nova, Spur
  3. Moss TX 4, Motley County
  4. Primoris Services Dallas headquarters
  5. Quanta Services Houston headquarters
  6. SOLV Energy Stillhouse Solar, Rogers

Pipeline contractors are not on this page. We will cover them separately.

Council record

Austin Energy's vegetation contracts, from 2020 to 2026

Austin is the one Central Texas utility whose vegetation awards we can trace to named firms and dollar limits. Each row is a City Council approval, with the minutes linked. Approval is not proof a contract was signed or is in use.

Austin City Council approvals of Austin Energy vegetation contracts, 2020 to 2026
Council dateWorkFirmsLimitTermRecord
Nov. 12, 2020Distribution lines, energizedAsplundh, Davey, WrightUp to $85 million, dividedUp to five years eachItem 34
Nov. 21, 2024Distribution lines, energizedAsplundh, Davey, WrightUp to $168 million, divided equallyTwo years plus four one-year optionsItem 39
Jan. 30, 2025Transmission lines, energizedWrightUp to $42 millionTwo years plus four one-year optionsItem 15
Apr. 9, 2026Street-lighting vegetationWrightUp to $9 millionThree years plus three one-year optionsItem 6
Apr. 9, 2026Distribution vegetationEocene Environmental GroupUp to $24 millionThree years plus three one-year optionsItem 7

Background photo: asplundh.com, an Asplundh truck. Asplundh is one of the three firms in the distribution contracts.

The 2020 contracts were for up to five years each, so the 2024 approval is a new set of contracts. Asplundh, Davey and Wright share the distribution work. The 2024 and 2025 approvals passed on consent, 11-0, and the 2026 approvals passed on consent, 9-0 (10-0 after a reconsideration vote).

Our count, original data

ERCOT's queue holds 46.1 GW of projects in Central Texas, and batteries are the biggest share

ERCOT publishes its generation interconnection queue each month. We cut the September 2026 report to the 23 counties from Waco to San Antonio where Clear Ground works, then counted projects and net gigawatts by fuel and by county. It is the best public view of where utility-scale site work may come from, though it never names a builder.

200projects in the queue in 21 of the 23 counties
46.1 GWnet capacity, solar, battery, gas and wind
163of them solar or battery, 31.3 GW
64solar and battery projects with a signed interconnection agreement

The 23 counties: Bandera, Bastrop, Bell, Bexar, Blanco, Burnet, Caldwell, Colorado, Comal, Fayette, Gillespie, Gonzales, Guadalupe, Hays, Kendall, Lampasas, Lee, Llano, McLennan, Milam, Travis, Williamson and Wilson.

Queue by fuel, ERCOT September 2026
FuelProjectsGWShare of GW
Battery storage10620.545%
Gas3413.930%
Solar5710.823%
Wind30.92%

Milam County leads on size, with 29 projects and 8.3 GW. Bexar follows at 5.2 GW, almost all battery storage. Bastrop and Caldwell hold 4.8 and 4.5 GW, mostly gas.

A queue entry is a request to connect, not a job under way. ERCOT's construction-start field is sparse: one project in these counties has a date (Hoyte Solar, Milam County, 206.75 MW, August 11, 2025), while 14 already have energization approval.

Milam
8.3 GW, 29
Bexar
5.2 GW, 22
Bastrop
4.8 GW, 12
Caldwell
4.5 GW, 16
Guadalupe
4.1 GW, 14
Wilson
3.5 GW, 15
McLennan
3.4 GW, 18
Bell
3.1 GW, 13
Colorado
1.8 GW, 12
Lampasas
1.7 GW, 10
Gonzales
1.2 GW, 7
Fayette
1.0 GW, 4
Comal
0.9 GW, 3
Travis
0.6 GW, 8
Williamson
0.4 GW, 1
Gillespie
0.4 GW, 3
Burnet
0.4 GW, 4
Bandera
0.3 GW, 2
Blanco
0.2 GW, 1
Hays
0.1 GW, 5
Kendall
0.1 GW, 1
  • Battery storage
  • Solar
  • Gas
  • Wind
Net capacity in gigawatts, then number of projects. Source: ERCOT GIS Report, September 2026, our county cut. Counties with no projects in the queue: Llano and Lee.

Owners we can name from the filing

Most queue entries use a one-project LLC, and 200 projects sit under 156 entities. We name a company only when its own name is in the entity's legal name. We do not guess parents. Pecan Springs Energy, LLC alone files eight projects, 1.6 GW, with no parent named.

Owners whose own name is in the interconnecting entity, Central Texas queue, September 2026
Name in the filingProjectsGWCountiesInterconnecting entity, as filed
LCRA83.32Bastrop, CaldwellLCRA
Big Watt Power20.90Caldwell, WilliamsonBig Watt Power Austin-1 LLC; Big Watt Power Mustang LLC
Ferrovial20.60McLennanFerrovial Energy US 1
RWE30.38Bastrop, Bexar, FayetteRWE Clean Energy Development, LLC; RWE Solar Developement, LLC; RWE Solar Development, LLC
Gransolar30.36Bell, McLennanGransolar Texas Eight, LLC; Gransolar Texas Nine, LLC; Gransolar Texas Twenty LLC
Elawan20.36McLennanElawan Cibeles Solar, LLC; Elawan Neutron Storage, LLC
Harrison Street20.25ColoradoHarrison Street Development, LLC
EDP Renewables10.24MilamEDP RENEWABLES NORTH AMERICA LLC
OCI Solar10.20BexarOCI Solar Power LLC
Samsung Solar10.20ColoradoSamsung Solar Energy 2, LLC
CPS Energy20.03BexarCPS Energy

Download the queue by project (CSV)

Profiles

What each firm does, and the Texas record we could check

Profiles run alphabetically. Company facts come from each firm's own site or a named public record, checked October 18, 2026. Anything a firm says about itself is marked as its claim. Photos come from each firm's own site and are credited on the image. Not every photo shows a Texas job.

Utility vegetation management

Near Philadelphia, PA

Asplundh Tree Expert
Austin Energy distribution contracts, 2020 and 2024

Asplundh says it was established in 1928 and is family-owned. Austin's City Council approved distribution vegetation contracts with Asplundh in November 2020 and again in November 2024, each shared with Davey and Wright.

Its contact page lists two Texas regional offices. Mansfield covers North and Central Texas. Corpus Christi covers South and West Texas.

Founded
1928, per its site
Headquarters
Near Philadelphia, PA, per its site
Texas basis
Mansfield and Corpus Christi offices on its contact page
Council record
Distribution contract, Nov. 21, 2024
Council record
Distribution contract, Nov. 12, 2020
Six Asplundh crew members in hard hats and safety vests walking a wooded path, one carrying a chainsaw, with a utility pole behind1928Established, per its own site
Photo: asplundh.com

Underground utility construction

Jonestown, TX

Austin Underground
Bore under Lady Bird Lake for an Austin Energy line

Austin Underground says it has done difficult underground installations since 2004. It was founded on municipal utility work. It says it has a presence in Austin, San Marcos and San Antonio.

City Council approved its Austin Energy contract on April 9, 2026. It covers the Lady Bird Lake bore for the Pedernales reconductor project, up to $3.0 million.

Founded
2004, per its site
Headquarters
18825 Packsaddle Rd, Jonestown, TX, per its site
Presence
Austin, San Marcos and San Antonio, per its site
Texas basis
Municipal utility work, per its site
Council record
Item 9, April 9, 2026

ROW clearing and mulching

Kerrville, TX

Cactus Creek Land Clearing
Hill Country clearing, with utility and pipeline work

Cactus Creek is a family-owned clearing company in Kerr County. Its site lists landowners, developers, utility providers and infrastructure clients, and describes clearing overgrowth on pipeline rights of way.

It runs forestry mulching, cedar clearing, rock milling and mesquite grubbing, and says it has the capacity to travel to take on projects.

Founded
Site gives both 2018 and 2000
Headquarters
2755 Junction Hwy, Kerrville, TX
Texas basis
Hill Country clearing, per its site

ROW clearing and mulching

Comfort, TX

Cedar Eaters of Texas
Right-of-way clearing from the Hill Country to McGregor

Pam and Stan Hegener founded Cedar Eaters in April 2001, and the company moved its headquarters to Comfort in 2016. Their son opened a northern division in McGregor.

Its site has a right-of-way clearing page aimed at utility work, next to cedar clearing, mesquite grubbing, hand crews and wildfire prevention.

Founded
April 2001, per its site
Headquarters
6707 Hwy 27, Comfort, TX
Texas basis
Right-of-way clearing page, per its site

ROW clearing and mulching

Houston, TX

Cleartex Forestry
Right-of-way clearing for utilities and pipelines

Cleartex says it supports utility contractors, energy providers, municipalities and developers throughout Texas, and clears easements by mulching and selective cutting along transmission lines, pipelines and telecom routes.

Its site claims 15-plus years of experience and no founding year.

Founded
Not stated; claims 15+ years
Headquarters
Greater Houston, TX, per its site
Texas basis
Right-of-way clearing page, per its site

Utility vegetation management

Kent, OH

Davey Tree Surgery Co.
Austin Energy distribution contracts, 2020 and 2024

The Davey Tree Expert Company's site says it was founded in 1880 and has been employee-owned since 1979. Its utility services cover vegetation management, asset management and make-ready engineering.

Davey Tree Surgery Co. is named with Asplundh and Wright in Austin's 2020 and 2024 distribution contracts.

Founded
1880, per its site
Headquarters
1500 N Mantua St, Kent, OH
Council record
Distribution contract, Nov. 21, 2024
Council record
Distribution contract, Nov. 12, 2020
A green Davey bucket truck parked under overhead power lines on a residential street, with cones and three workers beside it1880Founded, per davey.com
Photo: davey.com

ROW clearing and mulching

New Braunfels, TX

Eggemeyer Land Clearing
Highway rights of way, brush grinding and a recycling yard

Eggemeyer lists tree and brush grinding, land clearing for new and existing highways, tree trimming crews and a brush recycling center that sells mulch.

Its project list names highway right-of-way jobs, including 183 in Austin, I-35 in Georgetown and US 281 in San Antonio. It names no utility customer.

Founded
Not stated on its site
Headquarters
333 N Solms Rd, New Braunfels, TX
Texas basis
Highway jobs on its project page

Solar and storage EPC

St. Louis, MO

McCarthy Building Companies
Bright Arrow Solar and Storage, Hopkins County, TX

McCarthy says Timothy McCarthy built his first barn in 1864 and the company has been employee-owned since 2002. Its renewable energy page describes a utility-scale solar and energy storage EPC business.

That page lists two Texas projects. They are Bright Arrow Solar and Storage in Hopkins County and Cattlemen Solar Park in Milam County. McCarthy also lists offices in Houston, Austin, Dallas and Channelview.

Founded
1864, per its site
Headquarters
St. Louis, MO, per its site
Texas basis
Texas solar projects on its renewable energy page
Texas offices
Houston, Austin, Dallas, Channelview
Solar Power World
0.55 GW installed in Texas in 2025, per Solar Power World

Solar and storage EPC

Minneapolis, MN

Mortenson
Texas Solar Nova, Spur, TX

Mortenson says it began in 1954 as a small family-owned builder. Its San Antonio office says it has built in Texas for 30 years.

Its project page says it delivered Texas Solar Nova 1 and 2 in Spur, a 590 MWdc project on about 5,000 acres. It built the complex in two phases for Clearway Energy Group.

Founded
1954, per its site
Headquarters
Minneapolis, MN, per its site
Texas basis
Texas Solar Nova 1 and 2, Spur, TX
Texas office
San Antonio
Solar Power World
0.86 GW installed in Texas in 2025, per Solar Power World

Solar and storage EPC

Fort Lauderdale, FL

Moss
TX 4, a 332 MW solar project in Motley County

Moss runs solar EPC and construction management. Its site says its teams work from offices in Florida, Texas and Hawai'i.

Its project page for TX 4 lists Motley County, Texas, 332 MW of PV. Moss does not state a founding year on the pages we read.

Founded
Not stated on its site
Headquarters
6363 NW 6th Way, Fort Lauderdale, FL
Texas basis
TX 4, Motley County, TX, 332 MW PV
Texas office
Texas office, per its site
Solar Power World
1.04 GW installed in Texas in 2025, per Solar Power World
Aerial view of solar arrays and access roads on dry open ground at the TX 4 project, Motley County, Texas332 MWTX 4, Motley County, TX, per its project page
Photo: moss.com

Transmission, distribution, substations and solar

Dallas, TX

Primoris Services
Power Line Services and Primoris T&D in Fort Worth

Primoris says it has been building "since 1960." Its contact page lists a Dallas headquarters. Texas units include Power Line Services and Primoris T&D in Fort Worth and Primoris Energy Services in Houston.

Its power delivery page lists transmission, distribution and substation construction, plus emergency response. Renewables sit in a separate unit.

On November 21, 2024, City Council approved a construction contract with Primoris Energy Services for Austin Energy's 6th Street chilled-water line extension, up to $24.9 million. It is a chilled-water line, not an electric one.

Founded
1960, per its site
Headquarters
2300 N Field St, Dallas, TX
Texas basis
Texas units on its contact page
Line and substation work
Power delivery page
Council record
Item 42, Nov. 21, 2024
Solar Power World
1.29 GW installed in Texas in 2025, per Solar Power World
Crew members in hard hats beside a white Primoris pickup among rows of solar panels at low sun1960Building "since 1960," per its own site
Photo: prim.com

Transmission, substations and solar

Houston, TX

Quanta Services
Two public Texas transmission awards, 2008 and 2012

In March 2008 LCRA selected Quanta for a transmission expansion contract estimated at up to $194 million over five years, including right-of-way preparation. In May 2012 Electric Transmission Texas awarded Quanta two CREZ 345-kV construction contracts, about 155 miles. Both are old awards, and ETT did not disclose its values.

Quanta's site lists transmission, substation and distribution line construction, solar and wind EPC and battery storage.

Founded
1997, per its site
Headquarters
2727 North Loop West, Houston, TX
Public award
LCRA contract, March 2008
Public award
ETT CREZ contracts, May 2012
Solar Power World
1.85 GW installed in Texas in 2025, per Solar Power World
Drone view of battery storage containers around a substation at a Florida project shown on Quanta's site$194MLCRA transmission contract, 2008 (estimate)
Photo: quantaservices.com

Substations, storage and solar

San Jose, CA

Rosendin
Four Texas offices, from Coppell to San Antonio

Rosendin says it began as a family shop in San Jose in 1919. Its office list shows four in Texas: Austin, Coppell, Pflugerville and San Antonio.

Its energy page lists substations, switchyards, transmission lines, battery storage and utility-scale solar. It says it has more than 150 high-voltage substation projects across the United States. We found no Texas utility project on its site.

Founded
1919, per its site
Headquarters
880 Mabury Rd, San Jose, CA
Texas basis
Austin, Coppell, Pflugerville, San Antonio offices
Substation work
Energy page
A fenced electrical substation with transformers and steel structures on flat desert ground, mountains behind4Texas offices: Austin, Coppell, Pflugerville and San Antonio
Photo: rosendin.com

Solar and storage EPC

San Diego, CA

SOLV Energy
Stillhouse Solar, Rogers, TX, and three more Texas sites

SOLV says it started in 2008. Its project list shows Stillhouse Solar in Rogers, 281 MWdc with substation and transmission work. It also lists Eiffel in Paris, Alamo 1 in San Antonio and Prospero 1 in Andrews.

Those are the projects on its own site. We did not check owners or dates.

Founded
2008, per its site
Headquarters
16680 W Bernardo Dr, San Diego, CA
Texas basis
Stillhouse Solar Facility, Rogers, TX
Solar Power World
0.84 GW installed in Texas in 2025, per Solar Power World

ROW clearing and mulching

Hondo, TX

Texas Land Clearing Services
Utility, railroad, solar and wind clearing outside San Antonio

Texas Land Clearing Services (Cedar Beetle, Inc.) is a family business near San Antonio. Its site says it has been in the Texas land clearing industry for over 75 years and that the owner's grandfather bought his first dozer in 1936.

It lists utility and railroad right-of-way clearing, solar farm and wind farm clearing, and civil work. Its testimonials come from a vegetation coordinator at Medina Electric Cooperative and a vegetation maintenance supervisor at Pedernales Electric Cooperative.

Founded
Family business; first dozer bought 1936, per its site
Headquarters
1402 Kollman Dr, Hondo, TX
Texas basis
Medina EC and PEC testimonials on its site
Solar and wind
Solar farm land clearing page
A yellow Komatsu excavator on a rocky cleared slope with oak and cedar hills behind1936First dozer bought, per its own site
Photo: texaslandclearingservicescb.com

Utility vegetation management

Des Moines, IA

Wright Tree Service
Four Austin Energy contracts since 2020

John L. Wright founded Wright Tree Service in 1933, and the company says it has been employee-owned since 2002. It provides vegetation management, storm restoration and work planning to utilities.

City Council approved four Wright contracts for Austin Energy: distribution lines in 2020 and 2024, transmission lines in January 2025, and street lighting in April 2026. The table above has the dates and limits.

Founded
1933, per its site
Headquarters
Des Moines metro, IA, per its site
Council record
Street lighting, April 9, 2026
Council record
Transmission, Jan. 30, 2025
Council record
Distribution, Nov. 21, 2024
Council record
Distribution, Nov. 12, 2020
Three Wright Tree Service crew members carrying a chainsaw, climbing gear and rope across a lawn toward trees1933Founded, per its own site
Photo: wrighttree.com

More firms

Five more firms with Texas work on record

These firms meet the same rule but have less on their own sites we could verify, so they get a short entry.

5K Land Management

DFW area, TX

A family-owned clearing company based in the DFW area and serving Texas and Oklahoma. Its site has pages for right-of-way maintenance for utilities, contractors and municipalities along roads, pipelines and power lines, and for solar farm site prep. Its home page says seven years in business. Right-of-way page, solar page.

Photo: 5kland.com

Eocene Environmental Group

Wright Service Corp. family

On April 9, 2026, City Council approved an Austin Energy contract with Eocene for electric distribution vegetation management: three years plus three one-year options, up to $24 million (Item 7). Eocene says it is employee-owned and part of the Wright Service Corp. family of companies, which also includes Wright Tree Service (Wright Service Corp.). Its site lists electric utility vegetation services and traces its roots to a firm founded in 1999.

Photo: eocene.com

King's Land Clearing and Maintenance

Paris, TX

A Paris, Texas company with 20 years of combined experience that also cuts and bales hay. Its site lists right-of-way mulching for oil, gas and water pipelines with contractors, and says it covers all of Texas. Its site.

Photo: kingslandworks.com

Pannell Co.

Boerne, TX

A third-generation tree company in Boerne that says it specializes in utility line clearing. Its site lists TCIA accredited utility contractor status, an ISA utility specialist arborist and a TDA commercial applicator. Its contact page lists Bandera, Blanco and Leakey. Its site.

Photo: pannellco.com

TREES, LLC

Houston, TX

A utility vegetation management company that says it was founded in 1953, is headquartered in Houston, and works in more than 22 states for more than 40 customers. About page.

Photo: trees-llc.com

Who buys

Utilities post work in public, and most never name the builder

The firms above work for owners. Four Central Texas owners publish where contractors can find work. PEC's page names no builder for its two 2026 transmission projects. LCRA's pages for the Bell County East to Big Hill and Big Hill to Sand Lake 765-kV lines name no construction contractor. LCRA TSC and Oncor each propose to build half of each line.

Where four Central Texas utilities post work for contractors
OwnerWhere it posts workWhat the page shows
Austin EnergyAustin Finance OnlineOpen solicitations. Closed pages list who bid.
LCRALCRA business opportunitiesLinks to supplier registration and business opportunities. No award or bidder names.
Pedernales Electric CooperativePEC transmission projectsTwo 2026 transmission projects. No contractor named.
Bluebonnet Electric CooperativeBluebonnet vendorsRFQs, a procurement contact and endangered-species practices for right-of-way vendors.

Both 765-kV lines are under review at the Public Utility Commission of Texas, LCRA project page, PUC Docket 59475 and LCRA project page, PUC Docket 59182, and LCRA says each would be energized by the end of 2030 if approved. The Bell County East study area includes six of our 23 counties: Bell, Burnet, Lampasas, Llano, Milam and Williamson. Owners usually pick contractors through their own prequalification. Our energy and utility page covers how we work with them.

Method

How we chose them: Texas work we can point to

  • Who is in. A firm is listed if its own site or a public record shows Texas work, a Texas office or a named Texas utility customer in one of the five job types. The record is linked on each profile. We did not add a firm only because a trade list names it.
  • How they are sorted. Alphabetically, by job type. Nothing here is a ranking.
  • Why no ranking. Solar Power World's Texas list orders the firms that apply by kilowatts installed in Texas in 2025. Firms submit project data, which SPW says it checks against state interconnection records. Firms that do not apply are not on it, so it is not a full count. We show its figure on six profiles and do not rank on it.
  • Not used. Price, star ratings, safety scores, paid placement and our opinion.
  • Publisher. Clear Ground publishes this list and does not rank itself.
  • Left out. MYR Group (Thornton, Colorado) and Cinterra (North Carolina) show no Texas office or project on the pages we read. Alterman, a San Antonio and Austin electrical contractor, shows commercial work, not utility or energy work. That does not mean any of them does no Texas utility work.
  • Our ERCOT count. ERCOT's September 2026 GIS report, sheet "Project Details - Large Gen," cut to the 23 counties Clear Ground works in: Bandera, Bastrop, Bell, Bexar, Blanco, Burnet, Caldwell, Colorado, Comal, Fayette, Gillespie, Gonzales, Guadalupe, Hays, Kendall, Lampasas, Lee, Llano, McLennan, Milam, Travis, Williamson and Wilson. Llano and Lee have no projects. Net capacity can be zero or negative for repowering. The CSV lists every project.

Download the queue by project (CSV)

Limits

A queue shows where, not who builds it

  • No builder field. ERCOT's report has no contractor column. It names the interconnecting entity, usually a one-project company.
  • Only some projects appear. ERCOT lists large projects that have asked for a full interconnection study. Early requests are not in the report.
  • Requests, not construction. Projected dates come from developers. ERCOT's report also lists projects cancelled each month.
  • Self-performed and subbed work. Utilities do some line and clearing work themselves, and primes sub ground-level work. Public records seldom show either.
  • Old awards. The Quanta awards are from 2008 and 2012. They show history, not current backlog.
  • Council approvals. A Council approval shows a contract was authorized. We did not check whether each was signed.
  • Corrections. If a fact or photo about your company is wrong, email cody@clearground.com with a source and we will fix it. We re-run the ERCOT count each month.

Before you sub the work

Six questions to ask any ground-clearing or site-work sub

  1. Do you carry the insurance and the prequalification the owner requires, and can you send the certificate before mobilizing?
  2. Who locates and marks underground lines, and when? Will a locate call be made before every digging day?
  3. How do you handle protected trees and endangered-species practices on the right of way? Ask for the owner's rules in writing.
  4. What does the price include: mobilization, haul-off, chip or mulch left on site, erosion control and restoration?
  5. How will you stay outside the minimum approach distance from energized lines, and who does the work inside it?
  6. Can I call two customers whose jobs looked like mine?

What it costs

What ground-level clearing and trenching cost with us

Our price range

Forestry mulching runs, per acre

$2,000–$5,200

That covers light brush to dense cedar. Trenching runs $5–$40 per linear foot, and depth and rock drive the price. Right-of-way and utility jobs are quoted after a site walk.

See all pricingEnergy and utility work

Our services

We also provide right-of-way clearing, solar site prep and trenching

Clear Ground clears and preps ground for utilities and contractors: right-of-way clearing on transmission, distribution and pipeline corridors, solar and storage site prep, trenching and recurring maintenance. Energized line clearance goes to line crews qualified under OSHA 1910.269; we clear and mulch the ground work around it. We hold Avetta and ISNetworld.

Common questions

Texas utility contractors, answered

Who are the top utility contractors in Texas?

No public Texas record counts utility work by contractor, so we do not rank. We list 21 firms with documented Texas work, sorted by job type, and show the record behind each one.

Who does vegetation management for Austin Energy?

Asplundh Tree Expert, Davey Tree Surgery Co. and Wright Tree Service hold Austin Energy's distribution-line vegetation contracts. City Council approved them on November 21, 2024: two years plus four one-year options, up to $168 million in total. Wright also has the transmission-line contract (January 30, 2025, up to $42 million) and the street-lighting contract (April 9, 2026, up to $9 million). Eocene Environmental Group has a distribution vegetation contract (April 9, 2026, up to $24 million).

Who builds transmission lines in Texas?

Public records name few builders. LCRA selected Quanta for a transmission contract in 2008, and Electric Transmission Texas awarded Quanta two CREZ line contracts in 2012. For the 765-kV lines under review at the PUC and for PEC's 2026 projects, we found no construction contractor named. For the 765-kV lines, LCRA TSC and Oncor each propose to build half.

How many solar and battery projects are queued in Central Texas?

ERCOT's September 2026 report lists 163 solar and battery storage projects, 31.3 GW, in the 23 counties from Waco to San Antonio where we work. 64 of them have a signed interconnection agreement. A queue entry is a request to connect, not construction.

Does Clear Ground do energized line clearance?

No. We do ground-level work: right-of-way clearing, solar and storage site prep, trenching and maintenance agreements. Energized work belongs to qualified line clearance firms.

What does right-of-way clearing cost?

Our forestry mulching runs $2,000–$5,200 per acre, light brush to dense cedar. Trenching runs $5–$40 per linear foot. Utility jobs are quoted after a site walk.

How do I correct a listing or ask to be added?

Email cody@clearground.com with a source. We fix wrong facts and photos, and add firms that show Texas work in a public record or on their own site.

Working on a Texas utility or energy project?

Start with a free site assessment.

We scope every project in person before quoting. If we are not the right fit, we will say so.

Request a quote

Austin, the Texas Hill Country and Central Texas