Clear Ground clears, trenches and installs erosion controls on Texas solar and battery storage sites, working under your grading contractor. Clearing runs $3,000–$8,500 per acre. Collector and conduit trenching runs $5–$40 per linear foot. Most jobs start 1–3 weeks after approval.
This page covers solar. For right-of-way work and other utility scopes, see energy and utility site work. For repeat maintenance, see utility O&M agreements.
Weather closed the window before the EPC could mobilize. Every week of delay eats into the PPA economics. A sub with a clear schedule and a documented start helps.
The racking sub arrives and the surface does not match the plan. The civil engineer sets the tolerance and the grading contractor and surveyor verify it. We check quantities with drone flights, so problems show up earlier.
Trenches closed on a Friday and commissioning asked for the record three months later. We photograph and scan open trench before backfill and log where it runs.
We take the clearing, trenching and erosion control scopes. We start at parcel due diligence if you want a baseline flight, and we stay through the erosion control close-out.
Drone flight with RTK positioning before NTP. Vegetation cover, drainage paths and existing surface recorded. Volumes for early earthwork pricing. RTK-corrected drone photogrammetry, checked against ground points on site.
Forestry mulching and grubbing with our own fleet. Perimeter clearing for the security fence and defensible space in the same mobilization. Large footprints scale with partner and rental fleets.
The grading contractor builds the pads to your civil plans. We work ahead of them and beside them, and check cut/fill volumes with flights when asked.
Collector, inverter-pad conduit and gen-tie trenches. Open-trench photo and scan record before backfill. Rock handled with hydraulic hammers.
BMPs installed and maintained to your SWPPP, with a dated photo log. Final stabilization follows TCEQ Construction General Permit TXR150000.
| Stage | What we do | Handled by specialists |
|---|---|---|
| Pre-NTP | Baseline flight, early volumes, order-of-magnitude site-work pricing | Design, geotech, environmental assessment |
| NTP to mechanical completion | Clearing, trenching, erosion control, progress flights | Large-scale grading, racking, electrical |
| Post-COD | Repeat vegetation and erosion control visits; see the maintenance agreement page | Operations |
Our drone scans measure surfaces, quantities and grades. They are not a boundary survey or a sealed survey by a licensed surveyor, and a drone cannot see below the ground surface. Pad and racking tolerances are set and certified by your civil engineer and surveyor.
| Scope | Unit | Range |
|---|---|---|
| Clearing and grubbing | per acre | $3,000–$8,500 |
| Forestry mulching | per acre | $2,000–$5,200 |
| Collector and conduit trenching | per linear foot | $5–$40 |
| Rock excavation | per cubic yard | $35–$90 |
| Drone survey and volume report | per scan | $500–$1,500 |
Prices reviewed: September 2026. Ranges for Austin and Central Texas; your site walk sets the final number.
We take a phase or block of a solar site, or the clearing and trenching scope under a grading contractor. We self-perform with our own fleet and scale with partner and rental fleets to fit the footprint.
We scale up with dozers, larger excavators, forestry mulchers and compaction equipment from partner and rental fleets to fit the job.
Clearing and grubbing runs $3,000–$8,500 per acre and trenching runs $5–$40 per linear foot. Density, rock and access move those numbers, and a site walk sets the bid.
No. Your grading contractor builds the pads and your civil engineer and surveyor set and verify tolerance. We clear, trench and install erosion controls, and check volumes with drone flights.
We take a phase, a block, or the clearing and trenching scope under the grading contractor, and scale with partner and rental fleets to fit the acreage.
Sites disturbing one acre or more (or part of a larger common plan) need coverage under TCEQ permit TXR150000; sites of five acres or more also file a Notice of Intent. Final stabilization means 70% of native background vegetative cover.
Yes. Clearing, trenching and erosion control on BESS sites use the same scopes.
Send the site location, acreage, plan set if you have one, and your NTP target. We answer the same business day. NDA available.
Request an EstimateRegistered on Avetta and ISNetworld · Texas