TX contractor LIC
UT contractor INS
FAA PART 107 FAA 107
Insurance $2M GL
Technology About Contact
Aerial view of a Texas utility ROW corridor mid-MSA cycle with FAE mulcher and transmission line
Utility O&M · Electric · Co-op · Pipeline

MULTI-YEAR MSAs.
WEEKLY-VERIFIED ROW.

Your vegetation MSA bidder pool collapsed. Two of three approved subs raised rates 30%. The third went out of business. Your storm-response vendor ghosted the last 48-hour SLA. Your ESC inspections "happened" but the documentation is a clipboard. ClearGround delivers ROW clearing, weekly RTK-verified inspections, and 48-hour storm-response mobilization across Texas — the MSA you can renew without renegotiating.

Active — Austin Energy · LCRA · Oncor Pedernales · Bluebonnet · Statewide Texas

    MSA Discussion

    Request an MSA Discussion

    Send your scope and territory — we'll return an MSA-fit packet (COI, EMR, ESC procedures, weekly RTK inspection samples, references) within one business day.

    Response within 1 business day · ISN & Avetta prequalified · Austin Energy Qualified pursuit

    What Your O&M Team Already Knows
    01

    Your vegetation MSA bidder pool collapsed.

    Two of three approved subs raised rates 30% last cycle. The third went out of business. You're paying premium for crews that don't deliver documented inspections, and your storm-response window is shrinking every quarter. Your O&M lead is one rate-card review away from explaining to procurement why the MSA renewal looks like a different scope at twice the cost.

    02

    ESC inspection failures triggered a TCEQ Notice of Violation.

    Weekly inspections "happened" but the documentation is a smudged paper form from three weeks ago. 70% permanent vegetation coverage was never verified at the inspection cadence. Now you're explaining a Notice of Violation to a regional director who doesn't want explanations — and the NOV travels with the asset, not the contractor.

    03

    Storm-response SLA breached. Restoration was delayed.

    48-hour mobilization was the contract. The crew didn't show. ROW clearance for restoration slipped by three days. Your customer-facing exposure made the news. Procurement is asking why the standby fee was paid on a contract that didn't deliver — and the renewal conversation is no longer a conversation, it's an audit.

    The MSA Workflow Utilities Actually Need

    RECURRING. DOCUMENTED.
    RENEWABLE WITHOUT RENEGOTIATING.

    From RTK pre-cycle baseline to weekly inspection to TCEQ-defensible audit trail — five recurring milestones, every one documented to a standard your compliance officer can defend without writing a memo. Same crew on Cycle 1 as Cycle 12.

    01
    RTK Pre-Cycle Baseline

    Aerial mapping of the ROW or substation pad before mobilization. Vegetation density, encroachments, drainage, and access documented to ±0.5cm. Cycle pricing built from data, not memory.

    02
    ROW Mulching / Clearing

    FAE forestry head on CAT 299D3 XE. In-place mulching. No burn permits, no haul-off, no neighbor complaints. CAT 308E2 CR for tight substation access. Same crew, same cadence, every cycle.

    Learn about forestry mulching →
    03
    ESC Install + SWPPP

    SWPPP authoring in-house. Silt fence, wattles, and BMP install per TCEQ MS4 standard. Hydroseeding to LCRA 70% permanent vegetation coverage spec. ESC compliance becomes a deliverable, not a fire drill.

    04
    Weekly RTK Inspection

    Georeferenced drone inspection. BMPs verified weekly. 70% permanent vegetation coverage tracked to compliance. TCEQ-defensible photo log delivered to your compliance officer the same day.

    See the technology →
    05
    Storm-Response Standby

    48-hour mobilization on a contracted SLA. Pre-staged crews on retainer. ROW clearance to restore service in the window your customer-facing communications already committed to. Same documentation chain on the surge work.

    Texas utility ROW corridor overgrown with brush and small trees, transmission line infrastructure visible
    Pre-Mobilization
    Same Texas ROW after ClearGround mulching cycle — clean corridor with mulch returned to soil
    Post-Cycle
    Don't run an MSA you can't defend at audit

    AT EVERY CYCLE OF YOUR MSA
    GET A TCEQ-DEFENSIBLE RECORD

    1/5
    Cycle Baseline
    Phase 01 — Before Every Cycle

    ROW BASELINE
    RE-FLOWN EVERY CYCLE.

    A Mavic 3 Enterprise RTK ortho captures the ROW at ±0.5cm before each cycle. Vegetation regrowth density, encroachments, drainage, and access mapped. Cycle scope priced from data — and your compliance officer gets a permanent record of what was on the ground at every interval.

    ±0.5CM ACCURACY · MAVIC 3 RTK · REGROWTH DENSITY · ENCROACHMENT FLAGS · CYCLE TAKEOFF
    RTK orthomosaic of a transmission ROW corridor with regrowth density heat map and encroachment flags
    2/5
    In-Cycle ROW Mulching
    Phase 02 — No Burn Permits, No Haul-Off

    IN-PLACE MULCHING.
    MULCH BACK TO SOIL.

    CAT 299D3 XE with FAE forestry head processes cedar, juniper, and mesquite in place. Mulch returns to the soil — no burn permits, no haul-off trucks running through landowner properties, no neighbor complaints. Substations get CAT 308E2 CR with hammer for tight pad access in the same mobilization.

    CAT 299D3 XE · FAE MULCHER · CAT 308E2 CR · IN-PLACE PROCESSING · ZERO BURN PERMITS
    CAT 299D3 XE with FAE head clearing a utility ROW corridor, transmission tower line visible
    3/5
    ESC + SWPPP
    Phase 03 — TCEQ-Defensible Compliance

    ESC AUTHORED
    IN-HOUSE.

    SWPPP authoring in-house. Silt fence, wattles, hydroseeding to LCRA 70% permanent vegetation coverage standard. BMPs installed per TCEQ MS4 spec. Your compliance officer gets a defensible documentation package — not a clipboard your reviewer can flag.

    SWPPP AUTHORING · LCRA 70% VEG COVERAGE · TCEQ MS4 · HYDROSEEDING · BMP INSTALL
    SWPPP document on tablet with BMP inspection photos, silt fence install, and hydroseed coverage report
    4/5
    Weekly RTK Inspection
    Phase 04 — Audit Trail You Don't Reconstruct

    WEEKLY GEOREFERENCED
    INSPECTION.

    Georeferenced drone inspection every week. BMP status verified. 70% permanent vegetation coverage tracked over time. Photo log delivered to your compliance officer the same day — searchable, time-stamped, GPS-tagged. The audit trail is the deliverable, not a backfilled binder.

    WEEKLY CADENCE · GEOREFERENCED PHOTO LOG · BMP VERIFICATION · 70% VEG TRACKING · TCEQ-DEFENSIBLE
    Weekly inspection report dashboard with georeferenced photo pins, BMP status badges, and 70% coverage progress bar
    5/5
    Storm Response
    Phase 05 — 48-Hour Mobilization on SLA

    STORM RESPONSE.
    CREW PRE-STAGED.

    48-hour mobilization on a contracted standby SLA. Pre-staged crews on retainer fee. ROW clearance for restoration begins in the window your customer-facing communications already committed to. Same georeferenced documentation chain on the surge work — no shortcut on the audit trail.

    48-HR SLA · STANDBY RETAINER · PRE-STAGED CREWS · GEOREFERENCED SURGE DOCUMENTATION
    Storm-response crew mobilizing — trucks, FAE mulcher, chainsaw operators clearing downed limbs from ROW corridor
    What's In Scope Under One MSA

    FIVE SCOPES.
    ONE PHONE NUMBER.

    Contracting ROW vegetation, ESC compliance, hydroseeding, weekly inspection, and storm-response standby across five different vendors means managing five accountability chains every time a TCEQ regional director calls. Bundle them under one ClearGround MSA and your O&M lead has one phone number across the full lifecycle.

    How an MSA With ClearGround Works

    PREDICTABLE BASE.
    SURGE ON DEMAND.

    Most ROW vegetation subs are transactional — they bid the mile, they cut the mile, they leave. We structure as a multi-year MSA partner: predictable monthly base, contracted storm-response surge, and one documentation chain across both. Your renewal becomes a renewal — not a re-bid.

    Cycle 1 to N · Recurring
    Monthly / Quarterly MSA
    Pre-cycle RTK baseline, in-place mulching, ESC + SWPPP, weekly inspection. Same crew, same cadence, same documentation chain. Predictable monthly base.
    Storm Response · Standby
    48-Hour Contracted SLA
    Standby retainer holds capacity reserved. Pre-staged crew mobilizes within 48 hours of storm-event activation. Surge documentation on the same georeferenced chain — no audit-trail shortcut.
    Renewal · Year 3+
    Documented Justification
    Renewal rates justified by documented hours saved vs. legacy subs, TCEQ-defensible photo log, zero NOVs on your watch, and 70% permanent vegetation coverage tracked across cycles.
    Why Texas Utilities Talk to Us
    ±0.5cm
    RTK Inspection
    Accuracy
    48hr
    Storm Response
    SLA Mobilization
    70%
    LCRA Permanent
    Veg Coverage Std
    $/Mile
    Transparent
    Cycle Pricing
    "

    ESC compliance is a documentation game. We scan weekly, deliver georeferenced inspection reports, prove 70% permanent vegetation coverage with imagery your TCEQ inspector can verify, and mobilize within 48 hours when the storm event hits. ROW maintenance becomes a managed asset — not a fire drill your O&M team explains to procurement.

    — ClearGround · The Ground, Verified.

    [ PLACEHOLDER: Replace with utility O&M or co-op testimonial after first MSA closes ]

    LET'S STRUCTURE
    YOUR NEXT MSA.

    Send us your scope, your service territory, and your storm-response SLA. We'll return an MSA-fit packet — COI, EMR, ESC procedures, weekly inspection samples, and references — within one business day. Predictable monthly base, contracted surge, documentation that defends the renewal.

    Request MSA Discussion

    Austin Energy Qualified pursuit · LCRA-aware ESC · ISN & Avetta prequalified