$2M per occurrence / $5M aggregate general liability $2M GL
Registered on Avetta and ISNetworld Avetta · ISNetworld
Technology About Contact
Old outbuilding? We take it down, slab and all if you want.

GARAGE, SHED & BARN DEMOLITION IN AUSTIN & CENTRAL TEXAS.

Garage, shed and barn demolition in Austin and Central Texas runs $1,000–$8,000 per structure. Sheds, carports and detached garages sit at the low end, large and pole barns at the top. Most jobs take half a day to three days. Sorting, metal recycling and hauling are included; slab removal is an add-on at $4–$8 per sq ft.

Detached garage demolition, shed removal, carport tear-outs, and old barn demolition across Austin and the Hill Country. Part of Clear Ground's Austin demolition service: metal recycled, wood hauled, nothing buried.

Range Per Structure
$1,000–$8,000
On Site
½–3 DAYS
Start After Approval
1–3 WKS

Book a Site Walk
Range Per Structure
$1,000–$8,000
On Site
½–3 DAYS
Start After Approval
1–3 WKS

OUTBUILDING DEMOLITION,
DONE LIKE A REAL DEMO JOB.

Garage demolition, shed demolition, carport removal, and barn removal are the small jobs most demolition contractors don't want and most junk haulers can't finish. The structure comes down, the tin and lumber go in a trailer, and you're left with a slab, a footing, half a foundation, and a pile of nails in the grass. Clear Ground runs an outbuilding the same way we run a house: a site walk first, the right machine for the access you actually have, every load ticketed, metal recycled, wood hauled, nothing buried on site. If you want the slab gone too, we break it and haul it on the same mobilization. Written quote within 48 hours of the site walk.

Mini excavator demolishing a detached wood-frame garage in an Austin backyard (illustration)
Detached Garages
Garage Demolition
& Garage Removal

One- and two-car detached garages (wood frame, block, or metal) on suburban lots where the neighbor's fence is ten feet away. Roof and walls dropped inward, framing and roofing sorted on the slab, slab left in place or removed as an add-on. Tight-lot access is planned at the site walk, not discovered on demo day.

Typical: 200–600 SF · $1,000–$5,000 per structure · 1 day
Mini excavator removing a rusted metal storage shed in a fenced backyard (illustration)
Sheds & Storage Buildings
Shed Demolition
& Shed Removal

Metal kit sheds, wood storage buildings, workshops, and old well houses. The cheapest thing on the lot and the one most often left half-done. We take the structure, the floor framing or slab, the anchors, and the junk that was inside it, and we don't leave tin panels in the grass for the mower to find.

Typical: 80–300 SF · from $1,000 per structure · 0.5–1 day
Excavator removing a rusted metal carport on a rural Texas property (illustration)
Carports & Awnings
Carport & Metal
Structure Removal

Steel and aluminum carports, RV covers, lean-tos, and metal awnings. Posts pulled, footings broken out, panels stacked flat and recycled as scrap. The concrete apron underneath stays or goes, your call, priced per square foot as concrete removal.

Typical: per structure · from $1,000 per structure · 0.5 day

BARN DEMOLITION ON
HILL COUNTRY RANCH LAND.

Old barn demolition is its own animal. A weathered wood barn or a steel pole barn on a Hill Country ranch is bigger than it looks, further from the landfill than a suburban garage, and full of things that shouldn't get buried: tin roofing, treated posts, wire, old fuel, and a dirt or concrete floor that has been hiding whatever fell through the boards for forty years. The two shortcuts on ranch barns are to push it into a pile and burn it, or to push it into a hole and bury it. We do neither. The barn comes down in a controlled sequence with an excavator and hydraulic thumb, the tin and steel are separated and recycled, the lumber is loaded and hauled, and the footprint is graded so it's ready for a new barn, a pad, or pasture.

Pole barns, hay barns, tack sheds, loafing sheds, and equipment barns are all in scope. So are the concrete piers and slabs under them, priced per square foot as an add-on. Distance is built into the quote. We tell you the haul cost up front instead of discovering it on the invoice.

Typical Barn
Small wood or metal barn, 400–1,200 SF: $1,000–$5,000 per structure
Large Barn / Pole Barn
Large hay, equipment, or pole barns: $2,500–$8,000 per structure, depending on size, footings, and haul distance
Tin & Steel
Corrugated roofing, posts, and wire separated on site and sent to metal recycling, ticketed
Never Buried, Never Burned
Every load leaves the property on a ticket. No burn pile, no push-and-bury behind the tree line
Old leaning wooden barn with rusted tin roof on Hill Country ranch pasture (illustration)
Before — a typical Hill Country barn past saving
Excavator with hydraulic thumb pulling down an old wooden barn on ranch land (illustration)
During — controlled take-down with the hydraulic thumb

TEAR DOWN THE SHED FIRST.
THEN DECIDE WHAT THE GROUND IS FOR.

An outbuilding rarely comes down for its own sake. It's in the way of a new garage, a pool, an ADU pad, a bigger barn, or a cleaner lot to sell. That's why the slab question matters: a junk hauler leaves it because they can't remove it; we ask because the answer changes what you need next. Leave it if you're rebuilding on it. Remove it if you're grading, pouring new, or putting the ground back to grass. Either way, one crew and one mobilization takes you from standing structure to the next step.

01
Outbuilding Demolition

Garage, shed, carport, or barn taken down, sorted, and hauled. Metal recycled, wood hauled, nothing buried. This page.

→
02
Slab & Footing Removal

Optional add-on. The slab, piers, or footings broken out and hauled at $4–$8 per sq ft. See concrete & slab removal or foundation removal.

→
03
Site Prep or Clearing

Footprint graded. If a new structure is coming, site prep & pad prep starts here. If the ground is going back to pasture, land clearing finishes it.

→
04
Bigger Scopes

Outbuildings often ride along with a house demolition or a pool demolition. One mobilization, better price.

Bare concrete slab with anchor bolts left behind after a shed was removed (illustration)
What a junk hauler leaves behind: the slab, the anchors, and the sill plate. We ask about it before we quote.

GARAGE, SHED AND BARN DEMOLITION COST:
$1,000 TO $8,000 PER STRUCTURE.

Sheds, carports and detached garages run $1,000–$5,000 per structure. Large and pole barns run $2,500–$8,000 per structure. The slab is an add-on at $4–$8 per sq ft. The range depends on size, materials, whether there's a slab or footings under it, how far the trucks have to go, and whether a mini excavator has to squeeze through a gate. The site walk settles that before we write the number.

Outbuilding demolition price ranges, Austin and Central Texas
ServiceUnitRangeTypical timeline
Outbuildings: sheds, carports, detached garagesper structure$1,000–$5,0000.5–1 day
Large barns and pole barnsper structure$2,500–$8,0001–3 days
Slab and footing removal (add-on)per sq ft$4–$8Add about a day
Extra haul-off (contents, junk)per job$1,000–$3,500Hauling the demolition debris is included

Prices reviewed: September 2026. Ranges for Austin and Central Texas; your site walk sets the final number.

Every Demo Includes Site walk before the quote Sorting and metal recycling C&D recycling documentation Load tickets in your file

Ranges depend on structure size and materials, slab or footings present, site access, and haul distance, all confirmed at your site walk. Try the demolition calculator or read the demolition cost guide for a rough number first.

EVERY OUTBUILDING DEMO FOLLOWS THE SAME SEQUENCE: WALK, TAKE DOWN, SORT, GRADE
SMALL STRUCTURE.
SAME DISCIPLINE AS A HOUSE.
1/4
Pre-Mobilization
PHASE 01 — WALK THE LOT, MEASURE THE GATE
WALK FIRST. PRICE IN WRITING.

We look at the structure, the slab or footings under it, the trees around it, and the route from the street to the building. We measure the gate opening, check for overhead lines and septic, and decide whether it's an excavator job or a mini-excavator-through-the-side-yard job. For older buildings, ask us about testing for asbestos and lead paint before demolition. Written quote within 48 hours of the site walk.

SITE WALK · ACCESS ROUTE CONFIRMED · SLAB / FOOTINGS IDENTIFIED · WRITTEN QUOTE
Aerial view of a residential demolition site with an excavator and rubble (illustration)
Illustrative — representative visualization
2/4
Take-Down
PHASE 02 — CONTROLLED, INWARD, AWAY FROM THE FENCE
DROPPED IN. NOT PUSHED OVER.

Roofing comes off or gets folded in first, then walls are pulled inward with the hydraulic thumb so nothing lands on the neighbor's fence, your live oaks, or the pool deck. Block garages are broken course by course. Metal buildings are unbolted or sheared at the posts and laid flat. On a barn, we work bay by bay from the far end toward the truck. The machine matches the access: an excavator where there's room, a mini excavator on plywood mats where there isn't. Before the walls come down, utilities must be disconnected and capped.

EXCAVATOR OR MINI EXCAVATOR · HYDRAULIC THUMB · MATS THROUGH THE GATE · TREES AND FENCES PROTECTED
Compact excavator tearing down a detached garage with the roof collapsing inward (illustration)
Illustrative — representative visualization
3/4
Sort & Haul
PHASE 03 — TIN ONE PILE, WOOD ANOTHER, CONCRETE A THIRD
METAL RECYCLED. WOOD HAULED. NOTHING BURIED.

Everything gets sorted where it falls. Corrugated tin, steel posts, and wire go to metal recycling. Lumber, shingles, and drywall go to C&D. Concrete and block go to C&D recycling. Whatever was stored inside gets pulled and handled before the walls come down, and anything hazardous is flagged for you rather than mixed into a load. Every truck that leaves has a ticket, and the tickets come back to you.

METAL RECYCLING · C&D RECYCLING · EVERY LOAD TICKETED · NO BURN PILE · NO BURY PIT
Corrugated tin panels and old barn lumber sorted into separate piles beside a roll-off dumpster on ranch land (illustration)
Illustrative — representative visualization
4/4
Slab & Grade
PHASE 04 — THE PART THE JUNK HAULER SKIPS
SLAB OUT. GROUND BACK TO GRADE.

If you've added slab removal, a hydraulic hammer breaks the slab, apron, and footings on the same mobilization; concrete is loaded and hauled to C&D recycling with the rebar and mesh separated, at $4–$8 per sq ft. If the slab is staying, it's swept clean and the anchor bolts are cut flush. Either way, the footprint is graded: piers pulled, voids backfilled and compacted, surface left ready for sod, gravel, a new pad, or the next structure.

HYDRAULIC HAMMER · SLAB ADD-ON · PIERS PULLED · BACKFILL COMPACTED · ROUGH GRADE
View from an excavator cab of a hydraulic breaker working on a concrete slab (illustration)
Illustrative — representative visualization
Excavator loading old barn lumber and tin roofing into a roll-off dumpster on a ranch (illustration)
Excavator with Hydraulic Thumb
Primary Machine — Garages & Barns

Excavator with hydraulic thumb and bucket. Enough reach to pull a barn wall inward under control, with a compact radius that works next to a fence line or a live oak. It switches to a hydraulic hammer for slabs, aprons, and footings on the same day.

Mini excavator squeezing through a residential backyard gate on plywood mats (illustration)
Mini Excavator
Gate & Tight-Lot Access

For the backyard shed behind a standard gate and the garage in a side yard with no drive-through. Runs on plywood mats to protect turf and sprinkler lines and works in the space between a house and a fence. We decide which machine at the site walk, not on demo morning.

Excavator loading barn debris into a roll-off on a ranch (illustration)
Larger Equipment When Needed
Big Barns

Dozers, larger excavators and compaction equipment are rented locally when a job needs them.

TIN, WOOD, BLOCK.
EACH ONE LEAVES ON A TICKET.

An old garage or barn is three or four different waste streams, and the honest way to handle them is separately. Mixed loads cost more at the gate, can't be recycled, and are how tin ends up in a landfill and treated posts end up in a burn pile. We sort on site, we haul each stream to the right facility, and every load ticket and recycling receipt comes back to you. Nothing is buried on your property. Nothing is burned. If a hauler tells you otherwise, ask to see the tickets.

Tin, Steel & Aluminum
Roofing panels, posts, carport frames, wire, and hardware separated and sent to metal recycling
Lumber, Shingles & Drywall
Loaded and hauled to a C&D facility, never buried on site, never burned
Concrete & Block
Slab, block walls, piers, and footings broken to haul size and sent to concrete recycling, rebar pulled
Documentation
Load tickets and recycling receipts included in your job file
Demolition site with sorted piles of concrete rubble, bundled rebar, and wood beside roll-off dumpsters (illustration)
Mini excavator passing through a residential backyard gate on plywood mats with a metal shed beyond (illustration)
Homeowners

The Shed You've Been
Meaning to Deal With.

The leaning shed from the previous owner, the detached garage that's more raccoon than garage, the carport the last storm bent. You want it gone, you want the yard usable, and you don't want to find out afterward that the slab and the anchors are still there. We measure your gate at the site walk, bring the machine that fits, protect the fence and the trees, and leave you either a clean slab or clean dirt, priced before we start.

Book a Site Walk
Excavator with hydraulic thumb loading barn lumber into a roll-off container on a ranch (illustration)
Ranch & Estate Owners

The Barn That's Past Saving,
Forty Minutes From a Landfill.

Ranches carry old barns, pole sheds, and equipment buildings that have stopped being worth the roof repair. Distance is the real cost driver out here, and it's the one nobody puts in writing. We quote the haul up front, we recycle the tin instead of burying it behind the tree line, and we leave a graded footprint ready for a new barn pad or pasture. If you're clearing the whole homestead, an old house and a mobile home can go on the same mobilization.

See Land Clearing
How much does garage, shed or barn demolition cost in Austin? +

Outbuildings run $1,000–$5,000 per structure (sheds, carports, detached garages), and large or pole barns run $2,500–$8,000 per structure. Size, materials, slab or footings, access and haul distance move the number, and the site walk sets the final price.

What happens to the concrete slab under the garage or shed? +

Your call, and we ask before we quote. If it stays, we sweep it and cut the anchor bolts flush. If it goes, slab removal is $4–$8 per sq ft on the same mobilization, with rebar pulled and concrete hauled to recycling.

Will your equipment fit through my backyard gate? +

Usually. A mini excavator fits through most standard residential gates, and we run it on plywood mats to protect the lawn. We check the gate and the route at the site walk, and if a machine cannot reach the structure we say so.

Do you do barn and pole barn demolition on ranch land? +

Yes. Wood barns, steel pole barns, hay barns and equipment buildings are in scope at $2,500–$8,000 per structure for large and pole barns. We recycle the tin and steel, haul the lumber, pull posts and piers, and grade the footprint. We do not burn debris or bury it on your land.

Do I need a permit to tear down a shed, garage or barn? +

It depends on the city or county and on the structure. Some places exempt small accessory structures and others do not. We check whether your address needs a demolition permit and say so in the quote; where one applies we pull it or coordinate with whoever holds it.

What about electric, water and gas before demolition? +

Electric, water and gas must be disconnected and capped before demolition starts. The utility or a licensed professional does the disconnect. We confirm it is done before the machine moves.

Is there lead paint on an older garage, shed or barn? +

It can be. Older structures may have lead paint on siding, trim or doors. We plan for it, and if there is doubt we test before demolition. Tell us how old the building is when you call.

GARAGE, SHED, OR BARN TO TEAR DOWN?
WE WALK IT FIRST.

A site walk measures the structure, the slab, and the gate before we quote. Written quote within 48 hours of the site walk. Most jobs start 1–3 weeks after approval. Metal recycled, wood hauled, nothing buried.

Book a Site Walk

Austin & Central Texas · Fixed-price proposals · Insured: $2M per occurrence / $5M aggregate general liability · (512) 880-8888