Public-sector procurement runs on documentation. Bids are won by the sub that has the COI, EMR, safety file, certification status, and the audit trail to back every cubic yard. ClearGround delivers all of it — RTK-verified as-builts, IDIQ-ready response, HUB certification pursuit in progress, prime-bidder availability list visibility.
Your prime bid included three subs. Two had expired COIs, one had no current EMR letter. The procurement officer flagged the bid for missing prequal documentation. You lost the award on paperwork, not price.
You were on the rotation list. The TxDOT task order came in. You responded with a phone call and a verbal commitment. The other sub responded with an RTK-verified scope document and a same-day schedule. They won the task.
Your prime bid has a 15% HUB participation goal. You're at 8%. The HUB-certified site prep subs you've used before are booked or don't have the RTK capability your spec calls for. You're losing points on a scoring criterion you control.
From prequal package submission to IDIQ task-order response to final as-built handoff — five phases, every milestone documented to public-sector procurement standard.
COI, EMR, safety, environmental, equipment list, certifications. Submitted to your prime portal or agency portal directly.
Pre-work documentation. Existing conditions, drainage, vegetation density mapped to ±0.5cm.
FAE mulcher for ROW. CAT 308 for tight municipal sites. No burn permits, no haul-off, on-site mulch.
SWPPP-authored controls. TCEQ MS4-compatible weekly drone inspection. 70% vegetation cover verified.
RTK-verified as-built package in formats your inspector signs off on. Audit trail to satisfy any procurement review.
All services routed to ClearGround under public-sector procurement frameworks. Documentation-grade output across every task order.
Highway corridor mulching, brush clearing, defensible space at infrastructure. Documented per TxDOT vegetation management standards.
Park, detention pond, small-scale municipal lot clearing. Heritage tree CRZ compliance. Compatible with COA arborist standards.
SWPPP authoring, BMP install, weekly RTK inspection, hydroseeding to spec. TCEQ MS4-compatible documentation.
Rotation-list-ready 24-hour task response. Scope, schedule, and RTK pre-survey delivered with the response — not after the award.
Public-sector procurement runs on documentation. We deliver RTK-verified as-builts with the file formats and timestamps your inspector signs off on. The audit trail is the deliverable.
— ClearGround · The Ground, Verified.
Capability statement, prequal packet, COI, EMR, safety summary, certification status, and equipment list — all available within 24 hours of your request. HUB certification application in progress; status disclosed transparently.
Request Capability StatementTxDOT · COA ASMBR · HUB Pursuit · BuildingConnected · ISN