Your storm response can't depend on a vendor that ghosts. Your ESC compliance can't depend on paper logs in someone's truck. ClearGround delivers ROW clearing, solar site prep, and erosion control across Texas — with every inspection RTK-verified and every linear foot documented. The MSA you can renew without renegotiating.
Two of your three approved subs raised rates 30% last cycle. The third went out of business. You're paying premium for crews that don't deliver documented inspections, and your storm response window is shrinking every quarter.
Weekly inspections "happened" but the documentation is a smudged paper form from three weeks ago. Permanent vegetation coverage was never verified at 70%. Now you're explaining a Notice of Violation to a regional director who doesn't want explanations.
Weather window closed before the EPC could mobilize panels. Site prep sub didn't have RTK grade verification, so the EPC has to re-survey before they pour. Every week of delay costs the project's PPA economics — and somebody owes someone money.
From greenfield solar site prep to recurring ROW vegetation MSAs and storm-response standby — five phases, one crew, RTK-verified every cycle. Your compliance team gets the paper trail. Your O&M team gets the response window.
Aerial mapping of ROW, solar footprint, or substation pad. Densities, terrain, drainage all documented before crews mobilize.
FAE forestry mulcher for ROW + solar. CAT 308E2 CR for tight substation access. No haul-off, on-site mulch.
Collector trenching with LiDAR pre-backfill scan. Silt fence, wattles, and hydroseeding installed per SWPPP.
Georeferenced drone inspection. ESC BMPs verified. 70% permanent vegetation coverage tracked to compliance.
Vegetation MSA monthly cadence + storm-response standby. Renewable at the same rate because the documentation makes the case.
From solar site prep to recurring ROW maintenance to storm-response standby — all under one MSA structure. RTK documentation included on every cycle.
Mass grading and clearing for utility-scale solar. Cut/fill to spec with RTK + machine control. Collector trench routing pre-mapped.
Recurring transmission, distribution, and pipeline ROW mulching. FAE attachment, no burn permits, no haul-off. Monthly or quarterly cycle.
SWPPP-authored ESC install, weekly RTK-verified inspection, hydroseeding to LCRA 70% permanent vegetation coverage standard.
48-hour mobilization on a contracted SLA. ROW clearance to restore service. Georeferenced documentation delivered same-week.
ESC compliance is a documentation game. We scan weekly, deliver georeferenced inspection reports, and prove 70% permanent vegetation coverage with imagery your TCEQ inspector can verify. ROW maintenance becomes a managed asset, not a fire drill.
— ClearGround · The Ground, Verified.
Austin Energy Qualified status in progress. LCRA-aware ESC procedures. SWPPP authoring in-house. Let's structure an MSA that gives you predictable cost and verified compliance every cycle.
Request MSA DiscussionAustin Energy · LCRA · Oncor · Pedernales · Bluebonnet · ISN · Avetta