Pond & Stock Tank Construction

Pond & Stock Tank Construction in Austin & the Texas Hill Country

Dug right. Sealed right. · Priced by cut volume from a drone terrain model

Ranch ponds, stock tanks and retention basins. We fly your site, compute the cut volume, and build a compacted clay core designed to hold water in Hill Country ground. A pond that leaks is an expensive hole, so the sealing work gets the attention.

Clear Ground builds ranch ponds, stock tanks, recreation ponds and detention basins for landowners, developers and engineers in Austin and Central Texas. Price follows the cut volume from a drone terrain model, and rock in the cut is billed at $35–$90 per cubic yard. Most stock tanks take days to a couple of weeks of machine time. The quote covers strip, core trench, dam, liner, spillway and finish grading.

POND SECTION (ILLUSTRATION) ORIGINAL GRADE NORMAL POOL FREEBOARD DAM CORE TRENCH — KEYED TO TIGHT MATERIAL COMPACTED CLAY LINER — THIN LIFTS EMERGENCY SPILLWAY 0 DEPTH WATER LINE / BASIN CUT COMPACTED CLAY — SHEEPSFOOT ROLLED CORE TRENCH — KEYED INTO TIGHT MATERIAL ILLUSTRATION ONLY, NOT TO SCALE
½–5 ac
Typical pond sizes we build & rework
CY volume
Priced by cut volume from a drone terrain model
Thin lifts
Clay compacted in lifts with a sheepsfoot roller
1 packet
Documentation handed over on every job

Six Kinds of Water.
Built for Each of Them.

Ranch Ponds & Stock Tanks

The classic Texas tank — livestock water, wildlife draw, or just the pond your place deserves. Dug, shaped, cored and compacted so it stays full as long as your soil and rainfall allow.

Recreation & Fishing Ponds

Deeper basins with shelf structure for fish habitat, a dock-ready bank, and slopes graded for safe access. We shape the underwater terrain on purpose, not by accident.

Retention & Detention Basins

Engineered stormwater basins for developers and site plans — built to the civil drawing, with documented grades.

Silt & Erosion Control Basins

Sediment traps and silt ponds that slow storm water and drop it where you want it — not across your pasture or down your neighbor's fence line.

Pond Cleanout & Enlargement

Existing tank silted in, shrunk, or leaking? We drain, muck out, re-cut, re-core, and hand it back larger and re-sealed.

Berms, Swales & Water Shaping

The earthwork around the water — diversion berms, swales that feed the pond, and overflow paths that protect the dam when the big rain comes.

Much of the Hill Country
Is Hard Ground to Seal.

Here is the frank version: west of the Balcones Fault, Edwards and Glen Rose limestone sits near the surface, and fractured rock drains a pond fast. East of the fault the ground is Austin Chalk and Blackland Prairie clay, which seals differently. Which side of the fault you are on changes the design.

Sealing a pond is a construction sequence: check the soil you have, key a core trench down to tight material, then build the liner up in thin compacted clay lifts with a sheepsfoot roller. Skip a step and the pond is likelier to leak. No builder can promise a pond will hold water in every soil.

  • Soil checked before we quote. If your dirt cannot seal, we tell you what it takes (clay import or bentonite) or that it is not worth building
  • Core trench keyed into tight material under the dam
  • Clay placed in thin lifts and compacted at the right moisture
  • Freeboard and an emergency spillway, sized by your engineer where the site calls for one

What Goes Into a Pond We Cut

Survey
Drone flight + terrain model of your site (Pix4D)
Yardage
Cut volume computed in CY before we quote
Soil
Clay content checked at basin + borrow area
Core
Trench keyed to tight material, backfilled compacted
Liner
Clay in thin lifts, sheepsfoot compacted
Spillway
Primary + emergency overflow shaped and armored
Finish
Topsoil respread, banks graded, seed-ready
Handoff
Documentation packet: volumes, photos, grades

From Drone Flight
to Finished Pond.

01

Fly & Model

We fly your site and build a terrain model. You see the pond footprint, the dam location and the cut volume before anything moves. RTK-corrected drone photogrammetry, checked against ground points on site.

02

Soil & Water Check

Clay content, rock likelihood, and drainage area get checked. If the site needs imported clay or bentonite to seal, it is in the quote.

03

Written Quote

You get a quote priced from the measured yardage, with rock, clay import and haul-off as line items. Written quote within 48 hours of the site walk.

04

Strip & Core

Topsoil stripped and saved, core trench cut to tight material under the dam line, then backfilled in compacted lifts.

05

Shape & Compact

Basin cut to plan, dam built in lifts, clay liner sheepsfoot-rolled at moisture. Slopes and shelves graded to the drawing.

06

Finish & Document

Spillways shaped, topsoil respread, banks left seed-ready. You get the documentation packet: volumes, grades and photos of the core trench and liner before they go under water.

What We Build.
And What Needs an Engineer.

We Build

  • Ranch ponds and stock tanks, including those that fall under the Texas Water Code 11.142 exemption from a water-right permit (domestic and livestock use, up to 200 acre-feet)
  • Off-channel recreation and fishing ponds
  • Retention / detention basins built to a civil engineer's drawing
  • Cleanouts, enlargements, and re-sealing of existing tanks
  • The clearing, access, and dirt work around the pond — same mobilization

We'll Flag for Engineering

  • Dams tall or large enough to fall under TCEQ dam safety rules. That is a licensed engineer's work, and we say so on the site walk
  • Impoundments on flowing creeks or in wetlands. Water-right and Clean Water Act questions get answered before dirt moves
  • Anything where a failure would put water on a road, a house or a neighbor. We bring in an engineer

What a Pond Costs
Follows the Cut Volume.

We do not publish one price per pond, because a half-acre tank in clay and a one-acre basin in limestone are different jobs. Pricing is by cut volume from a drone terrain model of your site, with rock and clay import called out as line items.

ItemUnitRangeWhat moves it
Pond and dam earthworkCut volume (CY) from terrain modelQuoted after the site walkVolume, access, haul distance, weather window
Rippable caliche or limestoneCubic yard$35–$45 per cubic yardHow much rock is in the cut
Hard rock, hammeredCubic yard, or by the hour when volume cannot be known$65–$90 per cubic yardRock hardness and hammer time
Clay import or bentonitePer jobQuoted after soil checkHaul distance and how much sealing the soil needs

Prices reviewed: September 2026. Ranges for Austin and Central Texas; your site walk sets the final number.

Our drone scans measure surfaces, quantities and grades. They are not a boundary survey or a sealed survey by a licensed surveyor, and a drone cannot see below the ground surface.

Which Rules May Apply
to a Texas Pond.

  • Water-right permit. Under Texas Water Code section 11.142, a dam or reservoir for domestic and livestock use that stores no more than 200 acre-feet is exempt from a water-right permit. Commercial use is not covered by that exemption. The exemption does not cover the other rules below.
  • TCEQ Dam Safety Program. TCEQ regulates dams above certain size and hazard thresholds under 30 TAC Chapter 299, including a dam 25 feet or higher storing 15 acre-feet or more, or over 6 feet high storing 50 acre-feet or more, and any high or significant hazard dam. Some private dams are exempt. See the TCEQ Dam Safety Program. A licensed engineer designs a dam that falls under it.
  • Clean Water Act section 404. Fill placed in waters or wetlands of the United States can need a permit from the U.S. Army Corps of Engineers. Some farm and stock pond work is exempt, but not in navigable waters or adjacent wetlands. Check with the Corps of Engineers Fort Worth District Regulatory office before you dig on a creek or wetland.
  • Edwards Aquifer rules. 30 TAC Chapter 213 may apply if your site is on the recharge, transition or contributing zone in parts of Hays, Travis, Williamson, Comal, Bexar and other counties. Construction there needs a plan approved by TCEQ first. See the TCEQ Edwards Aquifer Protection Program.

Last reviewed: September 2026. This is a general summary, not legal or engineering advice. Rules change and depend on your site, so confirm with the agencies above or your engineer before you build. Also call 811 at least two business days before any digging.

What Landowners Ask
About Pond Construction.

Will my pond hold water?

It depends on your soil, and we check it before we quote. Clay content at the basin and borrow area, plus a core trench keyed into tight material, are what let a pond hold water. If your site needs imported clay or bentonite to seal, that goes in the quote up front. If the ground cannot seal a pond at a sensible cost, we will tell you.

Do I need a permit to build a pond in Texas?

Often not for a water-right permit. Texas Water Code section 11.142 exempts a dam or reservoir for domestic and livestock use that stores no more than 200 acre-feet, and that is an exemption from the water-right permit only. TCEQ dam safety rules, a Clean Water Act section 404 permit, or Edwards Aquifer rules can still apply. See the regulatory section on this page, then we go through your site on the walk.

How do you price a pond?

By cut volume. We fly the site, build a terrain model in Pix4D, and compute the cubic yards to move before we quote. Rock in the cut is billed per cubic yard: $35–$45 per cubic yard for rippable caliche or limestone and $65–$90 per cubic yard when it has to be hammered. Clay import and haul-off are separate line items.

What happens to the dirt from the basin?

Most of it usually stays on your land as the dam, berms, a pad or fill for low spots. Using the cut on site is generally cheaper than hauling it off, and we plan the cut and fill balance in the terrain model before we dig.

Can you fix a pond that leaks or has silted in?

Yes. We drain it down, muck out the sediment and look for the cause. A missing core trench or a thin liner are common causes, but every pond is different. Then we re-cut, re-core and re-compact in lifts.

How long does a pond take to build?

A half-acre to one-acre stock tank is often days to a couple of weeks of machine time, depending on yardage, rock and weather. Clay needs the right moisture to compact, so wet spells slow it down. Most jobs start 1–3 weeks after approval. Your quote carries a schedule.

Show Us the Spot.
We'll Fly It and Work Out the Yardage.

Tell us roughly where the pond goes and how big you're thinking. We will fly the site, model the terrain and quote from the measured volume.