TX contractor LIC
UT contractor INS
FAA PART 107 FAA 107
Insurance $2M GL
Pricing Technology About Contact
Aerial drone shot of TxDOT ROW vegetation maintenance — highway corridor cleared and mulched with RTK survey verification
Public Infrastructure

TxDOT-READY.
DOCUMENTATION-GRADE.

Public-sector procurement runs on documentation. Bids are won by the sub that has the COI, EMR, safety file, certification status, and the audit trail to back every cubic yard. ClearGround delivers all of it — RTK-verified as-builts, IDIQ-ready response, HUB certification pursuit in progress, prime-bidder availability list visibility.

Active — TxDOT Austin · San Antonio Districts COA · CapMetro · Travis Co · Williamson Co

    Capability Statement

    Request a Capability Statement

    Send your bid number or task-order ID — we'll return a capability packet (COI, EMR, safety summary, HUB status, equipment list, RTK as-built samples) within one business day.

    Response within 1 business day · TxDOT vendor · HUB pursuit in progress

    The Problem Procurement Already Knows
    01

    The sub list got disqualified at bid intake.

    Your prime bid included three subs. Two had expired COIs, one had no current EMR letter. The procurement officer flagged the bid for missing prequal documentation. You lost the award on paperwork, not price.

    02

    The IDIQ task order went to someone with documentation.

    You were on the rotation list. The TxDOT task order came in. You responded with a phone call and a verbal commitment. The other sub responded with an RTK-verified scope document and a same-day schedule. They won the task.

    03

    MBE/WBE/HUB sub gap is killing your goal compliance.

    Your prime bid has a 15% HUB participation goal. You're at 8%. The HUB-certified site prep subs you've used before are booked or don't have the RTK capability your spec calls for. You're losing points on a scoring criterion you control.

    The Procurement-Ready Workflow

    PREQUAL-FIRST. DOCUMENTED-LAST.

    From prequal package submission to IDIQ task-order response to final as-built handoff — five phases, every milestone documented to public-sector procurement standard.

    01
    Prequal Submission

    COI, EMR, safety, environmental, equipment list, certifications. Submitted to your prime portal or agency portal directly.

    02
    RTK Site Survey

    Pre-work documentation. Existing conditions, drainage, vegetation density mapped to ±0.5cm.

    03
    ROW Veg / Site Clearing

    FAE mulcher for ROW. CAT 308 for tight municipal sites. No burn permits, no haul-off, on-site mulch.

    04
    Weekly ESC Inspection

    SWPPP-authored controls. TCEQ MS4-compatible weekly drone inspection. 70% vegetation cover verified.

    05
    As-Built Documentation

    RTK-verified as-built package in formats your inspector signs off on. Audit trail to satisfy any procurement review.

    What's In Scope

    IDIQ-READY. PRIME-BID-READY.

    All services routed to ClearGround under public-sector procurement frameworks. Documentation-grade output across every task order.

    01

    TxDOT ROW Vegetation

    Highway corridor mulching, brush clearing, defensible space at infrastructure. Documented per TxDOT vegetation management standards.

    02

    Municipal Site Clearing

    Park, detention pond, small-scale municipal lot clearing. Heritage tree CRZ compliance. Compatible with COA arborist standards.

    03

    Erosion & Sediment Control

    SWPPP authoring, BMP install, weekly RTK inspection, hydroseeding to spec. TCEQ MS4-compatible documentation.

    04

    IDIQ Task Response

    Rotation-list-ready 24-hour task response. Scope, schedule, and RTK pre-survey delivered with the response — not after the award.

    What Matters to Procurement
    ±0.5cm
    RTK As-Built
    24hr
    IDIQ Response
    HUB
    Certification in Progress
    SWPPP
    In-House Authoring
    "

    Public-sector procurement runs on documentation. We deliver RTK-verified as-builts with the file formats and timestamps your inspector signs off on. The audit trail is the deliverable.

    — ClearGround · The Ground, Verified.

    ADD CLEARGROUND
    TO YOUR SUB LIST.

    Capability statement, prequal packet, COI, EMR, safety summary, certification status, and equipment list — all available within 24 hours of your request. HUB certification application in progress; status disclosed transparently.

    Request Capability Statement

    TxDOT · COA ASMBR · HUB Pursuit · BuildingConnected · ISN