Aerial of a Central Texas hyperscale campus parcel mid-earthwork — 200+ acre cleared footprint, mass-graded pads, perimeter ROW visible
Data Center Contractors · Heavy Civil + EPC + Mid-Tier GC

PREDICTABLE PADS.
PREQUAL-READY SUB.

Your owner is asking why mass clearing is two weeks late. Your safety officer is asking why your sub's SWPPP binder lives in a truck. Your estimator is asking who's left in the Tier-2 sub pool that hasn't raised rates 30%. We're the self-perform site-prep sub that closes all three questions — prequal-ready on ISN, Avetta, and BuildingConnected, with a weekly digital twin that writes your OAC update for you.

Active — Austin · San Antonio · Temple · Taylor Georgetown · Hutto · Milam Co · Caldwell Co

    Site Walkthrough

    Request a Site Walkthrough

    Send your parcel and a target window — we'll come out, fly the RTK ortho, and come back with a self-perform site-prep bid your estimator can defend line by line. 48-hour response.

    48-hour response · ISN · Avetta · BuildingConnected

    What's Keeping Your Preconstruction Lead Up at Night
    01

    A site sub just put your critical path on the wrong side of the schedule.

    Mass clearing slipped two weeks. Mass grading is short on iron. The pad delivery window is closing, commissioning is already asking about MEP rough-in dates, and your PE has to explain it at the OAC meeting on Tuesday. The schedule recovery cost compounds with every day you can't see the dirt move — and it eats your prime fee, not the sub's.

    02

    Your Tier-2 sub pool just collapsed.

    Two of three approved subs raised rates 30% over last year's pricing. The third went out of business in Q4. You're paying premium for crews that don't document, can't pass an ISN audit, and won't show up with iron when the schedule demands it. Your bid list got shorter and more expensive at the same time, and your estimator is out of options for the next campus.

    03

    A SWPPP failure on your sub's site is a failure on your safety record.

    BMPs blew out in the last rain. Sediment reached the receiving water. Your sub's ESC documentation is a clipboard, not a record. TCEQ's Notice of Violation doesn't just hit your sub — it shows up in your prime portfolio's audit history when the next hyperscale owner runs prequalification on your firm. Owners check.

    The Site-Prep Sequence Your Schedule Depends On

    ONE SELF-PERFORM SUB.
    FROM GREENFIELD TO PAD-READY.

    The site-prep scope on a hyperscale campus has five hard milestones. Each one is a documentation event. Each one is a place your sub list usually fails — and your PE gets to explain why at the OAC meeting. We own all five scopes from one crew with one accountability chain, so your prime workflow has one phone number instead of five.

    01
    RTK Site Intelligence

    Mavic 3 RTK orthomosaic, vegetation density, topo + drainage flow, T&E flagging, EPA-relevant features. Pre-mobilization scan that closes due diligence and feeds the work plan.

    02
    Mass Clearing & Mulching

    CAT 299D3 XE + FAE forestry head. In-place mulching on multi-hundred-acre footprints. Zero haul-off when feasible. Perimeter ROW and defensible space cleared in the same mobilization.

    Learn about forestry mulching →
    03
    Mass Grading + Bedrock

    RTK + machine control to spec. CAT 308E2 CR with hydraulic hammer for limestone. On-site rock milling reduces haul-off on Hill Country sites. Cut/fill verified to plan, not to memory.

    Learn about excavation →
    04
    Conduit & Utility Trenching

    Generator pads, fiber, power skids. LiDAR subsurface scan before every backfill — the as-built doesn't get reconstructed later, it gets captured live. Owner gets the trench record the day it's closed.

    05
    Weekly Digital Twin

    Every Friday, the campus model updates. Progress acreage, cut/fill heat map, ESC photo log, sub-area sign-offs — delivered to the GC, the owner, and the commissioning team in one package.

    See the technology →
    200-acre Central Texas hyperscale parcel pre-mobilization with mixed cedar/oak coverage and limestone terrain
    Pre-Mobilization
    Same 200-acre parcel after Clear Ground campus site prep — mass-graded pads to spec, perimeter mulched
    Pad-Ready
    Multi-week before/after time-lapse grid of campus earthwork — clearing through pad-ready
    Don't hand off a campus that can't pass an owner audit

    AT EVERY MILESTONE OF YOUR CAMPUS
    GET A VERIFIABLE RECORD OF THE GROUND

    1/5
    Site Intelligence
    Phase 01 — Before the First Bucket

    WE SCAN THE PARCEL
    BEFORE WE MOBILIZE.

    A Mavic 3 Enterprise RTK ortho captures the full parcel at ±0.5cm before mobilization. Vegetation density, topo, drainage flow, T&E flags, and EPA-relevant features are documented to feed the work plan and the SWPPP. Preconstruction gets a takeoff backed by data. The developer gets a due-diligence-grade record of what was on the ground on Day Zero.

    ± 0.5CM ACCURACY · MAVIC 3 ENTERPRISE RTK · TOPO + DRAINAGE MODELING · T&E + EPA FLAGGING · QUANTITY TAKEOFF
    RTK survey orthomosaic with topo contour lines, drainage flow arrows, and T&E flag pins overlaid on a Central Texas parcel
    2/5
    Mass Clearing
    Phase 02 — Iron On Multi-Hundred-Acre Footprints

    IN-PLACE MULCHING.
    ZERO HAUL-OFF WHEN FEASIBLE.

    CAT 299D3 XE with FAE forestry head processes cedar, juniper, and mesquite in place. Mulch returns to the soil. The perimeter ROW and defensible-space corridor get cleared in the same mobilization as the campus footprint. One operator culture, one accountability chain, one mobilization cost.

    CAT 299D3 XE · FAE MULCHER · IN-PLACE PROCESSING · ZERO BURN PERMITS · PERIMETER ROW INCLUDED
    Aerial of CAT mulcher clearing a hyperscale campus footprint with mulch behind the machine and perimeter tree line preserved
    3/5
    Mass Grading + Bedrock
    Phase 03 — RTK Machine Control to Spec

    CUT/FILL VERIFIED.
    PAY APPS THAT DON'T BOUNCE.

    CAT 308E2 CR with hydraulic hammer takes the limestone. On-site rock milling cuts haul-off on Hill Country sites. Grade is verified against the engineering with RTK positioning and InSite elevation data — not a string line. The cut/fill comparison is in the owner's hands before the pay app gets submitted.

    CAT 308E2 CR · HYDRAULIC HAMMER · ON-SITE ROCK MILLING · RTK GRADE VERIFICATION · INSITE ELEVATION PRO
    InSite Elevation Pro split screen — engineered grade plan beside graded surface with cut/fill heat map and pay-app quantity column
    4/5
    Trenching + Subsurface Scan
    Phase 04 — As-Built Captured Live

    EVERY TRENCH SCANNED
    BEFORE BACKFILL.

    Generator pads, fiber, power skids, dewatering. Every conduit run gets a LiDAR subsurface scan before the trench closes. The as-built model isn't reconstructed three months later from memory — it's captured the day the work happens. Commissioning gets a georeferenced record they can hand to facility operations on Day One.

    LIDAR SUBSURFACE SCAN · PRE-BACKFILL CAPTURE · GEOREFERENCED CONDUIT MODEL · OWNER-GRADE AS-BUILT
    LiDAR subsurface scan of an open conduit trench with point cloud overlay showing conduit positions, depths, and clearances, plus CAD/BIM-native export panel
    5/5
    Weekly Delivery
    Phase 05 — Friday Digital Twin

    ONE PACKAGE.
    EVERY STAKEHOLDER. EVERY WEEK.

    Every Friday, the campus digital twin updates. Progress acreage, cut/fill heat map, ESC photo log, SWPPP BMP status, sub-area sign-offs, and the next week's plan. Hosted on DroneDeploy. Shareable with the GC, the developer, the owner, the commissioning team, and the lender. No OAC meeting goes off the rails because nobody could see the dirt move.

    WEEKLY CADENCE · DRONEDEPLOY PLATFORM · ESC + SWPPP PHOTO LOG · MULTI-STAKEHOLDER ACCESS · PERMANENT RECORD
    Live DroneDeploy 3D model of a hyperscale campus mid-construction with weekly progress timeline, acreage counter, cut/fill summary, ESC sign-off badges, and multi-user access panel
    What Self-Perform Means On Your Bid Sheet

    FIVE SCOPES.
    ONE MOBILIZATION.

    Bid these scopes separately and you're managing five subcontracts, five COIs, five accountability chains, and five places your schedule can slip — every one of them a sub-list risk your PE has to defend. Bid them as one self-perform package with Clear Ground and your preconstruction lead has one phone number from greenfield to pad-ready.

    Prequalification Posture

    SEND THE PREQUAL PACKAGE.
    WE'LL CLOSE IT THIS WEEK.

    Your preconstruction team doesn't have time to chase a sub through a 6-week onboarding cycle. We're registered or actively onboarding on every major prequalification platform your primes use. Insurance is carried at hyperscale minimums. Safety stack is documented. ISN audit history is ready to share on request.

    Prequal Portals
    ISNetworld · Avetta · BuildingConnected
    Registered or actively onboarding on the platforms primes and developers use to screen subs.
    Insurance
    $2M GL · $5M+ Umbrella · $1M Auto · $1M WC
    Carried at hyperscale-standard minimums. Pollution liability available on request for SWPPP scopes.
    Safety + Credentials
    OSHA 30 · FAA Part 107 · RTK GPS Operator Cert
    Safety practices documented. Drone operations licensed. Operator credentials maintained across the crew.
    Why Heavy Civil + EPC Primes Talk to Us
    7,823 MW
    Austin–SA Planned
    DC Capacity
    140+
    Data Centers
    Under Construction · TX
    ±0.5cm
    RTK Grade
    Verification Accuracy
    Weekly
    Digital Twin Delivery
    Every Friday
    "

    Heavy civil primes don't tolerate a sub list with five accountability chains and a SWPPP binder that lives in a truck. We bid the campus as one self-perform package, scan it weekly, and hand your preconstruction lead an audit trail the owner can't argue with. Your PE stops defending sub-list risk in the OAC meeting because the dirt moves on schedule and the documentation is in the deck.

    — Clear Ground · The Ground, Verified.

    [ PLACEHOLDER: Replace with heavy civil prime or EPC testimonial after first hyperscale campus closes ]

    LET'S GET ON
    YOUR BID LIST.

    Send us your prequal package and the parcel. We'll close the ISN / Avetta / BuildingConnected loop the same week, fly the RTK ortho, and come back with a self-perform site-prep bid your estimator can defend line by line. Heavy civil prime, EPC, or mid-tier GC — same 48-hour response.

    Request a Site Walkthrough