TX contractor LIC
UT contractor INS
FAA PART 107 FAA 107
Insurance $2M GL
Technology About Contact
Aerial of a Central Texas hyperscale campus parcel mid-earthwork with skid steer, mass-graded pads, and forest tree line
Data Center Developers · Site Selection + Owner-Side

GREENFIELD-READY PARCELS.
OWNER-GRADE PROOF.

You're racing to close a parcel before someone else does. Your site-selection lead wants the parcel scanned during due diligence — not after the LOI clears. Your construction director wants one sub from due-diligence walk through commissioning. Your facility-ops team wants georeferenced as-builts they can hand to operations on Day One. We engage at Day Zero and stay through the multi-phase campus expansion.

Active — Austin · San Antonio · Temple · Taylor Georgetown · Hutto · Milam Co · Caldwell Co

    Due-Diligence Scan

    Schedule a Due-Diligence Site Scan

    Send the parcel — even before the LOI clears. We'll fly the RTK ortho, model vegetation density, flag T&E and EPA concerns, and return an order-of-magnitude earthwork estimate. NDA available.

    Scans flown within 7 days · NDA available · Pre-LOI engagements welcome

    What's Costing You on the Parcel
    01

    Your due-diligence cycle has no site-prep partner.

    You're racing to close a 700-acre parcel before someone else does. The seller has a topo from 2019 and a tree survey nobody trusts. You can't price the earthwork, can't model the pad cost, can't underwrite the campus capex — because the parcel is still a question mark when the LOI deadline hits. The deal closes on assumptions, not data.

    02

    ESC violations travel with the property, not the sub.

    BMPs blew out in the last rain. Sediment reached the receiving water. TCEQ's Notice of Violation lands on your asset, not your contractor's safety record. Hyperscale tenants check enforcement history on every parcel they sign — and once it's on the property, you don't get to outsource the audit trail.

    03

    Pay app verification fails. You paid for work you can't prove happened.

    Your construction director approved the mass-grading pay app. The sub measured the pad with a string line. Three months later, facility ops asks for the as-built and there is no as-built. You're reconstructing documentation for work that was already invoiced — or you're writing the discrepancy off and absorbing the loss against the campus capex.

    Day Zero to Day One of Operations

    ONE PARTNER.
    DUE DILIGENCE TO COMMISSIONING.

    Most site-prep subs show up after the GC mobilizes and leave when the pad is ready. We engage when you're still underwriting the parcel and stay through the multi-phase campus expansion. One scan cadence, one audit trail, one phone number across the full development lifecycle — and the same crew comes back for Phase 2.

    01
    Due-Diligence RTK Scan

    Engaged at Day Zero. Mavic 3 RTK orthomosaic flown during your underwriting cycle — vegetation density, topo, drainage flow, T&E flagging, EPA-relevant features. Earthwork order-of-magnitude pricing before LOI clears.

    02
    Mass Clearing & Mulching

    CAT 299D3 XE + FAE forestry head. In-place mulching on multi-hundred-acre footprints. Zero haul-off when feasible. Perimeter ROW and defensible space cleared in the same mobilization.

    Learn about forestry mulching →
    03
    Mass Grading + Bedrock

    RTK + machine control to spec. CAT 308E2 CR with hydraulic hammer for limestone. On-site rock milling reduces haul-off on Hill Country sites. Cut/fill verified to plan, not to memory.

    Learn about excavation →
    04
    Conduit & Utility Trenching

    Generator pads, fiber, power skids. LiDAR subsurface scan before every backfill — the as-built doesn't get reconstructed later, it gets captured live. Owner gets the trench record the day it's closed.

    05
    Weekly Digital Twin

    Every Friday, the campus model updates. Progress acreage, cut/fill heat map, ESC photo log, sub-area sign-offs — delivered to the GC, the owner, and the commissioning team in one package.

    See the technology →
    200-acre Central Texas hyperscale parcel pre-mobilization — perimeter access loop, undulating wooded terrain, scan badge dated 2024-03-15
    Pre-Mobilization
    Same 200-acre parcel after Clear Ground campus site prep — graded pads, perimeter loop intact, scan badge dated 2024-06-10
    Pad-Ready
    Multi-week time-lapse grid of campus earthwork — mass clearing, weekly scan, mass grading, trenching, and digital twin overlay
    Don't hand off a campus that can't pass an owner audit

    AT EVERY MILESTONE OF YOUR CAMPUS
    GET A VERIFIABLE RECORD OF THE GROUND

    1/5
    Site Intelligence
    Phase 01 — Before the First Bucket

    WE SCAN THE PARCEL
    BEFORE WE MOBILIZE.

    A Mavic 3 Enterprise RTK ortho captures the full parcel at ±0.5cm before mobilization. Vegetation density, topo, drainage flow, T&E flags, and EPA-relevant features are documented to feed the work plan and the SWPPP. Preconstruction gets a takeoff backed by data. The developer gets a due-diligence-grade record of what was on the ground on Day Zero.

    ± 0.5CM ACCURACY · MAVIC 3 ENTERPRISE RTK · TOPO + DRAINAGE MODELING · T&E + EPA FLAGGING · QUANTITY TAKEOFF
    DroneDeploy + InSite Pro ortho with vegetation density heat map overlay, topo contour lines, drainage flow, and T&E flag pins on a Central Texas parcel
    2/5
    Mass Clearing
    Phase 02 — Iron On Multi-Hundred-Acre Footprints

    IN-PLACE MULCHING.
    ZERO HAUL-OFF WHEN FEASIBLE.

    CAT 299D3 XE with FAE forestry head processes cedar, juniper, and mesquite in place. Mulch returns to the soil. The perimeter ROW and defensible-space corridor get cleared in the same mobilization as the campus footprint. One operator culture, one accountability chain, one mobilization cost.

    CAT 299D3 XE · FAE MULCHER · IN-PLACE PROCESSING · ZERO BURN PERMITS · PERIMETER ROW INCLUDED
    Aerial of skid-steer mulcher clearing a hyperscale campus footprint with mass-graded pads behind it and the campus river corridor visible
    3/5
    Mass Grading + Bedrock
    Phase 03 — RTK Machine Control to Spec

    CUT/FILL VERIFIED.
    PAY APPS THAT DON'T BOUNCE.

    CAT 308E2 CR with hydraulic hammer takes the limestone. On-site rock milling cuts haul-off on Hill Country sites. Grade is verified against the engineering with RTK positioning and InSite elevation data — not a string line. The cut/fill comparison is in the owner's hands before the pay app gets submitted.

    CAT 308E2 CR · HYDRAULIC HAMMER · ON-SITE ROCK MILLING · RTK GRADE VERIFICATION · INSITE ELEVATION PRO
    InSite Elevation Pro split screen — engineered grade plan beside graded surface with ±0.5cm cut/fill heat map and pay-app quantity column
    4/5
    Trenching + Subsurface Scan
    Phase 04 — As-Built Captured Live

    EVERY TRENCH SCANNED
    BEFORE BACKFILL.

    Generator pads, fiber, power skids, dewatering. Every conduit run gets a LiDAR subsurface scan before the trench closes. The as-built model isn't reconstructed three months later from memory — it's captured the day the work happens. Commissioning gets a georeferenced record they can hand to facility operations on Day One.

    LIDAR SUBSURFACE SCAN · PRE-BACKFILL CAPTURE · GEOREFERENCED CONDUIT MODEL · OWNER-GRADE AS-BUILT
    LiDAR point cloud scan of an open conduit trench with color-coded utility runs and a CAD/BIM-Native Export panel (.IFC / .RVT / .DWG)
    5/5
    Weekly Delivery
    Phase 05 — Friday Digital Twin

    ONE PACKAGE.
    EVERY STAKEHOLDER. EVERY WEEK.

    Every Friday, the campus digital twin updates. Progress acreage, cut/fill heat map, ESC photo log, SWPPP BMP status, sub-area sign-offs, and the next week's plan. Hosted on DroneDeploy. Shareable with the GC, the developer, the owner, the commissioning team, and the lender. No OAC meeting goes off the rails because nobody could see the dirt move.

    WEEKLY CADENCE · DRONEDEPLOY PLATFORM · ESC + SWPPP PHOTO LOG · MULTI-STAKEHOLDER ACCESS · PERMANENT RECORD
    DroneDeploy campus model with Week 1–12 progress timeline, multi-user access panel, 250-acre counter, 1.2M cubic-yard cut/fill summary, and ESC sign-off badges for grading, drainage, and SWPPP
    Five Scopes. One Owner-Side Partner.

    FIVE SCOPES.
    ONE OWNER-SIDE PARTNER.

    Contracting these scopes separately during a Phase-1 campus build means managing five subs at exactly the moment your team is also closing land, negotiating the GC, and signing your first tenant. Engage them as one self-perform package with Clear Ground and you have one sub to manage — across Phase 1, Phase 2, Phase N, and into perimeter recurring once the campus is operational.

    How We Engage Across the Campus Lifecycle

    DAY ZERO TO DAY ONE
    OF OPERATIONS.

    Most site-prep subs are transactional — they show up, they bid, they execute, they leave. We engage as a campus partner from the parcel-under-LOI moment through facility-ops handoff and into the multi-phase expansion. One relationship across the full asset lifecycle, the same crew on Phase 2 as Phase 1.

    Day Zero · Due Diligence
    Parcel Scan Before LOI
    Pre-LOI RTK ortho. Vegetation density model. EPA + T&E flagging. Earthwork order-of-magnitude pricing. We close underwriting questions before the deal does.
    Phase 1 · Execution
    Greenfield to First-Pad-Ready
    Mass clearing, mass grading, conduit trenching, weekly digital twin. Self-perform site prep with owner-grade documentation included as a standard line item — not a change order.
    Phase 2 to N · Expansion
    Same Crew. Same Cadence.
    Phase 2, Phase 3, Phase N. Same crew, same scan cadence, same documentation chain. Plus perimeter and defensible-space recurring once the campus is operating.
    Why Developers Engage Us at Day Zero
    7,823 MW
    Austin–SA Planned
    DC Capacity
    140+
    Data Centers
    Under Construction · TX
    ±0.5cm
    RTK Grade
    Verification Accuracy
    Weekly
    Digital Twin Delivery
    Every Friday
    "

    Hyperscale developers don't have a GC to lean on during due diligence — they need a site-prep partner who can scan a parcel during the deal cycle and stay through the multi-phase expansion. We engage at Day Zero, deliver an owner-grade audit trail your facility-ops team accepts on Day One, and come back for Phase 2 with the same crew and the same scan cadence.

    — Clear Ground · The Ground, Verified.

    [ PLACEHOLDER: Replace with developer or owner-side testimonial after first parcel closes ]

    LET'S WALK
    YOUR NEXT PARCEL.

    Send us the parcel — even before the LOI clears. We'll fly the RTK ortho, model the vegetation density, flag the T&E concerns, and come back with an order-of-magnitude earthwork estimate your construction director can underwrite. Owner-grade documentation included from Day Zero, NDA on request.

    Schedule a Due-Diligence Site Scan

    Central TX Corridor · Due-Diligence Scans Within 7 Days · NDA Available