You're racing to close a parcel before someone else does. Your site-selection lead wants the parcel scanned during due diligence — not after the LOI clears. Your construction director wants one sub from due-diligence walk through commissioning. Your facility-ops team wants georeferenced as-builts they can hand to operations on Day One. We engage at Day Zero and stay through the multi-phase campus expansion.
You're racing to close a 700-acre parcel before someone else does. The seller has a topo from 2019 and a tree survey nobody trusts. You can't price the earthwork, can't model the pad cost, can't underwrite the campus capex — because the parcel is still a question mark when the LOI deadline hits. The deal closes on assumptions, not data.
BMPs blew out in the last rain. Sediment reached the receiving water. TCEQ's Notice of Violation lands on your asset, not your contractor's safety record. Hyperscale tenants check enforcement history on every parcel they sign — and once it's on the property, you don't get to outsource the audit trail.
Your construction director approved the mass-grading pay app. The sub measured the pad with a string line. Three months later, facility ops asks for the as-built and there is no as-built. You're reconstructing documentation for work that was already invoiced — or you're writing the discrepancy off and absorbing the loss against the campus capex.
Most site-prep subs show up after the GC mobilizes and leave when the pad is ready. We engage when you're still underwriting the parcel and stay through the multi-phase campus expansion. One scan cadence, one audit trail, one phone number across the full development lifecycle — and the same crew comes back for Phase 2.
Engaged at Day Zero. Mavic 3 RTK orthomosaic flown during your underwriting cycle — vegetation density, topo, drainage flow, T&E flagging, EPA-relevant features. Earthwork order-of-magnitude pricing before LOI clears.
CAT 299D3 XE + FAE forestry head. In-place mulching on multi-hundred-acre footprints. Zero haul-off when feasible. Perimeter ROW and defensible space cleared in the same mobilization.
Learn about forestry mulching →RTK + machine control to spec. CAT 308E2 CR with hydraulic hammer for limestone. On-site rock milling reduces haul-off on Hill Country sites. Cut/fill verified to plan, not to memory.
Learn about excavation →Generator pads, fiber, power skids. LiDAR subsurface scan before every backfill — the as-built doesn't get reconstructed later, it gets captured live. Owner gets the trench record the day it's closed.
Every Friday, the campus model updates. Progress acreage, cut/fill heat map, ESC photo log, sub-area sign-offs — delivered to the GC, the owner, and the commissioning team in one package.
See the technology →
A Mavic 3 Enterprise RTK ortho captures the full parcel at ±0.5cm before mobilization. Vegetation density, topo, drainage flow, T&E flags, and EPA-relevant features are documented to feed the work plan and the SWPPP. Preconstruction gets a takeoff backed by data. The developer gets a due-diligence-grade record of what was on the ground on Day Zero.
CAT 299D3 XE with FAE forestry head processes cedar, juniper, and mesquite in place. Mulch returns to the soil. The perimeter ROW and defensible-space corridor get cleared in the same mobilization as the campus footprint. One operator culture, one accountability chain, one mobilization cost.
CAT 308E2 CR with hydraulic hammer takes the limestone. On-site rock milling cuts haul-off on Hill Country sites. Grade is verified against the engineering with RTK positioning and InSite elevation data — not a string line. The cut/fill comparison is in the owner's hands before the pay app gets submitted.
Generator pads, fiber, power skids, dewatering. Every conduit run gets a LiDAR subsurface scan before the trench closes. The as-built model isn't reconstructed three months later from memory — it's captured the day the work happens. Commissioning gets a georeferenced record they can hand to facility operations on Day One.
Every Friday, the campus digital twin updates. Progress acreage, cut/fill heat map, ESC photo log, SWPPP BMP status, sub-area sign-offs, and the next week's plan. Hosted on DroneDeploy. Shareable with the GC, the developer, the owner, the commissioning team, and the lender. No OAC meeting goes off the rails because nobody could see the dirt move.
Contracting these scopes separately during a Phase-1 campus build means managing five subs at exactly the moment your team is also closing land, negotiating the GC, and signing your first tenant. Engage them as one self-perform package with Clear Ground and you have one sub to manage — across Phase 1, Phase 2, Phase N, and into perimeter recurring once the campus is operational.
Multi-acre to multi-hundred-acre campus footprints. In-place processing on the full parcel and the perimeter ROW. Zero haul-off when feasible.
RTK + machine control to engineered spec. On-site rock milling for limestone. Cut/fill verified before the pay app. The pad delivery window stops being aspirational.
Generator pads, fiber, power skids, dewatering. LiDAR subsurface scan before every backfill. The as-built is captured live, not reconstructed later.
Defensible space, perimeter ROW, easement corridors. Same FAE head, same crew, optional recurring vegetation management once the campus is operational.
Weekly Friday digital twin delivered as a standard line item — not a change order. Owner-grade as-builts, ESC/SWPPP photo log, multi-stakeholder access.
Most site-prep subs are transactional — they show up, they bid, they execute, they leave. We engage as a campus partner from the parcel-under-LOI moment through facility-ops handoff and into the multi-phase expansion. One relationship across the full asset lifecycle, the same crew on Phase 2 as Phase 1.
Hyperscale developers don't have a GC to lean on during due diligence — they need a site-prep partner who can scan a parcel during the deal cycle and stay through the multi-phase expansion. We engage at Day Zero, deliver an owner-grade audit trail your facility-ops team accepts on Day One, and come back for Phase 2 with the same crew and the same scan cadence.
— Clear Ground · The Ground, Verified.
[ PLACEHOLDER: Replace with developer or owner-side testimonial after first parcel closes ]
Send us the parcel — even before the LOI clears. We'll fly the RTK ortho, model the vegetation density, flag the T&E concerns, and come back with an order-of-magnitude earthwork estimate your construction director can underwrite. Owner-grade documentation included from Day Zero, NDA on request.
Schedule a Due-Diligence Site ScanCentral TX Corridor · Due-Diligence Scans Within 7 Days · NDA Available