Your owner is asking why mass clearing is two weeks late. Your safety officer is asking why your sub's SWPPP binder lives in a truck. Your estimator is asking who's left in the Tier-2 sub pool that hasn't raised rates 30%. We're the self-perform site-prep sub that closes all three questions — prequal-ready on ISN, Avetta, and BuildingConnected, with a weekly digital twin that writes your OAC update for you.
Mass clearing slipped two weeks. Mass grading is short on iron. The pad delivery window is closing, commissioning is already asking about MEP rough-in dates, and your PE has to explain it at the OAC meeting on Tuesday. The schedule recovery cost compounds with every day you can't see the dirt move — and it eats your prime fee, not the sub's.
Two of three approved subs raised rates 30% over last year's pricing. The third went out of business in Q4. You're paying premium for crews that don't document, can't pass an ISN audit, and won't show up with iron when the schedule demands it. Your bid list got shorter and more expensive at the same time, and your estimator is out of options for the next campus.
BMPs blew out in the last rain. Sediment reached the receiving water. Your sub's ESC documentation is a clipboard, not a record. TCEQ's Notice of Violation doesn't just hit your sub — it shows up in your prime portfolio's audit history when the next hyperscale owner runs prequalification on your firm. Owners check.
The site-prep scope on a hyperscale campus has five hard milestones. Each one is a documentation event. Each one is a place your sub list usually fails — and your PE gets to explain why at the OAC meeting. We own all five scopes from one crew with one accountability chain, so your prime workflow has one phone number instead of five.
Mavic 3 RTK orthomosaic, vegetation density, topo + drainage flow, T&E flagging, EPA-relevant features. Pre-mobilization scan that closes due diligence and feeds the work plan.
CAT 299D3 XE + FAE forestry head. In-place mulching on multi-hundred-acre footprints. Zero haul-off when feasible. Perimeter ROW and defensible space cleared in the same mobilization.
Learn about forestry mulching →RTK + machine control to spec. CAT 308E2 CR with hydraulic hammer for limestone. On-site rock milling reduces haul-off on Hill Country sites. Cut/fill verified to plan, not to memory.
Learn about excavation →Generator pads, fiber, power skids. LiDAR subsurface scan before every backfill — the as-built doesn't get reconstructed later, it gets captured live. Owner gets the trench record the day it's closed.
Every Friday, the campus model updates. Progress acreage, cut/fill heat map, ESC photo log, sub-area sign-offs — delivered to the GC, the owner, and the commissioning team in one package.
See the technology →
A Mavic 3 Enterprise RTK ortho captures the full parcel at ±0.5cm before mobilization. Vegetation density, topo, drainage flow, T&E flags, and EPA-relevant features are documented to feed the work plan and the SWPPP. Preconstruction gets a takeoff backed by data. The developer gets a due-diligence-grade record of what was on the ground on Day Zero.
CAT 299D3 XE with FAE forestry head processes cedar, juniper, and mesquite in place. Mulch returns to the soil. The perimeter ROW and defensible-space corridor get cleared in the same mobilization as the campus footprint. One operator culture, one accountability chain, one mobilization cost.
CAT 308E2 CR with hydraulic hammer takes the limestone. On-site rock milling cuts haul-off on Hill Country sites. Grade is verified against the engineering with RTK positioning and InSite elevation data — not a string line. The cut/fill comparison is in the owner's hands before the pay app gets submitted.
Generator pads, fiber, power skids, dewatering. Every conduit run gets a LiDAR subsurface scan before the trench closes. The as-built model isn't reconstructed three months later from memory — it's captured the day the work happens. Commissioning gets a georeferenced record they can hand to facility operations on Day One.
Every Friday, the campus digital twin updates. Progress acreage, cut/fill heat map, ESC photo log, SWPPP BMP status, sub-area sign-offs, and the next week's plan. Hosted on DroneDeploy. Shareable with the GC, the developer, the owner, the commissioning team, and the lender. No OAC meeting goes off the rails because nobody could see the dirt move.
Bid these scopes separately and you're managing five subcontracts, five COIs, five accountability chains, and five places your schedule can slip — every one of them a sub-list risk your PE has to defend. Bid them as one self-perform package with Clear Ground and your preconstruction lead has one phone number from greenfield to pad-ready.
Multi-acre to multi-hundred-acre campus footprints. In-place processing on the full parcel and the perimeter ROW. Zero haul-off when feasible.
RTK + machine control to engineered spec. On-site rock milling for limestone. Cut/fill verified before the pay app. The pad delivery window stops being aspirational.
Generator pads, fiber, power skids, dewatering. LiDAR subsurface scan before every backfill. The as-built is captured live, not reconstructed later.
Defensible space, perimeter ROW, easement corridors. Same FAE head, same crew, optional recurring vegetation management once the campus is operational.
Weekly Friday digital twin delivered as a standard line item — not a change order. Owner-grade as-builts, ESC/SWPPP photo log, multi-stakeholder access.
Your preconstruction team doesn't have time to chase a sub through a 6-week onboarding cycle. We're registered or actively onboarding on every major prequalification platform your primes use. Insurance is carried at hyperscale minimums. Safety stack is documented. ISN audit history is ready to share on request.
Heavy civil primes don't tolerate a sub list with five accountability chains and a SWPPP binder that lives in a truck. We bid the campus as one self-perform package, scan it weekly, and hand your preconstruction lead an audit trail the owner can't argue with. Your PE stops defending sub-list risk in the OAC meeting because the dirt moves on schedule and the documentation is in the deck.
— Clear Ground · The Ground, Verified.
[ PLACEHOLDER: Replace with heavy civil prime or EPC testimonial after first hyperscale campus closes ]
Send us your prequal package and the parcel. We'll close the ISN / Avetta / BuildingConnected loop the same week, fly the RTK ortho, and come back with a self-perform site-prep bid your estimator can defend line by line. Heavy civil prime, EPC, or mid-tier GC — same 48-hour response.
Request a Site WalkthroughCentral TX Corridor · 48-Hour Response · COI + EMR + Safety Stack On Request